Solving production lot size problem with an improved delivery policy and failure in rework by a simplified solution procedure

被引:0
|
作者
Chiu, Yuan-Shyi Peter [1 ]
Lee, Chien-Hua [1 ]
Lin, Li-Wen [1 ]
Lin, Yi-Chun [1 ]
Ting, Chia-Kuan [1 ]
机构
[1] Chaoyang Univ Technol, Dept Ind Engn & Management, Wufong 413, Taichung County, Taiwan
来源
关键词
Operations management; production-shipment system; lot sizing; failure in rework;
D O I
10.1080/02522667.2011.10700117
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
A simplified solution procedure is proposed in this paper to solve a specific production lot size problem with an improved delivery policy and failure in rework. Unlike the conventional method using diff erential calculus with the need for proving optimality of the longrun average cost function, this paper demonstrates that the optimal lot size and its related costs for the aforementioned production model can be derived without derivatives. Such an approach may enable practitioners who with little knowledge of calculus to understand with ease the realistic production-shipment integrated systems.
引用
收藏
页码:1253 / 1258
页数:6
相关论文
共 22 条
  • [1] A simple solution procedure for solving the multi-delivery policy into economic production lot size problem with partial rework
    Chung, K. -J.
    Ting, P. -Sh.
    Cardenas-Barron, L. E.
    SCIENTIA IRANICA, 2017, 24 (05) : 2640 - 2644
  • [2] An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework
    Eduardo Cardenas-Barron, Leopoldo
    Taleizadeh, Ata Allah
    Trevino-Garza, Gerardo
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (18) : 13540 - 13546
  • [3] The simplified solution procedures for solving replenishment lot size problem with discontinuous issuing policy and rework
    Chung, Kun-Jen
    Eduardo Cardenas-Barron, Leopoldo
    Liao, Jui-Jung
    Ting, Pin-Shou
    JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2018, 39 (08): : 1665 - 1672
  • [4] Combining an alternative multi-delivery policy into economic production lot size problem with partial rework
    Chiu, Singa Wang
    Chiu, Yuan-Shyi Peter
    Yang, Jyh-Chau
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) : 2578 - 2583
  • [5] Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework
    Chen, Kuang-Ku
    Wu, Mei-Fang
    Chiu, Singa Wang
    Lee, Chien-Hua
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (02) : 2232 - 2235
  • [6] Replenishment Lot Sizing with a Cost Reduction Delivery Policy and Failure in Rework
    Chiu, Singa Wang
    Chen, Kuang-Ku
    Chiu, Yuan-Shyi Peter
    Pan, Nong
    WMSCI 2011: 15TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL II, 2011, : 54 - 58
  • [7] Reexamination of "Combining an alternative multi-delivery policy into economic production lot size problem with partial rework" Using an Alternative Approach
    Chiu, Y-S. P.
    Chen, K-K.
    Cheng, F-T.
    Ting, C-K.
    JOURNAL OF APPLIED RESEARCH AND TECHNOLOGY, 2013, 11 : 317 - 323
  • [9] Solving an economic production lot size problem with multi-delivery policy and quality assurance using an algebraic approach
    Chiu, Yuan-Shyi Peter
    Chen, Kuang-Ku
    Chang, Huei-Hsin
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2010, 69 (12): : 926 - 929
  • [10] Determining Replenishment Lot Size and Shipment Policy for an EPQ Inventory Model with Delivery and Rework
    Eduardo Cardenas-Barron, Leopoldo
    Trevino-Garza, Gerardo
    Taleizadeh, Ata Allah
    Vasant, Pandian
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015