Solving production lot size problem with an improved delivery policy and failure in rework by a simplified solution procedure

被引:0
|
作者
Chiu, Yuan-Shyi Peter [1 ]
Lee, Chien-Hua [1 ]
Lin, Li-Wen [1 ]
Lin, Yi-Chun [1 ]
Ting, Chia-Kuan [1 ]
机构
[1] Chaoyang Univ Technol, Dept Ind Engn & Management, Wufong 413, Taichung County, Taiwan
来源
关键词
Operations management; production-shipment system; lot sizing; failure in rework;
D O I
10.1080/02522667.2011.10700117
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
A simplified solution procedure is proposed in this paper to solve a specific production lot size problem with an improved delivery policy and failure in rework. Unlike the conventional method using diff erential calculus with the need for proving optimality of the longrun average cost function, this paper demonstrates that the optimal lot size and its related costs for the aforementioned production model can be derived without derivatives. Such an approach may enable practitioners who with little knowledge of calculus to understand with ease the realistic production-shipment integrated systems.
引用
收藏
页码:1253 / 1258
页数:6
相关论文
共 22 条
  • [21] An alternative approach for determining production-lot size with repairable items and cost reduction delivery policy
    Chiu, Singa Wang
    Yang, Jyh-Chau
    Wu, Mei-Fang
    AFRICAN JOURNAL OF BUSINESS MANAGEMENT, 2011, 5 (04): : 1374 - 1377
  • [22] Solving a vendor-buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach
    Tseng, Chao-Tang
    Wu, Mei-Fang
    Lin, Hong-Dar
    Chiu, Yuan-Shyi Peter
    ECONOMIC MODELLING, 2014, 36 : 30 - 36