A two-phase approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework

被引:0
|
作者
Chiu, Singa Wang [1 ]
Yang, Jyh-Chau [1 ]
Huang, Chao-Chih [2 ]
Chiang, Kuo-Wei [2 ]
机构
[1] Chaoyang Univ Technol, Dept Business Adm, Taichung 413, Taichung Cty, Taiwan
[2] Chaoyang Univ Technol, Dept Ind Engn & Management, Taichung 413, Taichung Cty, Taiwan
来源
关键词
Production-shipment policy; operations management; algebraic approach; rework;
D O I
10.1080/02522667.2011.10700128
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
This paper presents a two-phase algebraic approach for jointly determining the lot size and delivery policy in a vendor-buyer integrated system with rework. Conventional method uses the differential calculus for solving production-shipment problem with the need for proving optimality first on the system cost function. This study proposes a two-phase algebraic solution procedure to derive the optimal lot size as well as optimal number of deliveries without using derivatives. The proposed approach enables practitioners who maybe without sufficient knowledge of calculus to understand such a specific real world problem with ease.
引用
收藏
页码:1417 / 1423
页数:7
相关论文
共 27 条