Study on Project Duration Risk Based on Unascertained-PERT

被引:0
|
作者
Ma Lihua [1 ]
Wang Aifeng [1 ]
Yan Aifeng [1 ]
机构
[1] Hebei Univ Engn, Sch Econ & Management, Handan 056038, Peoples R China
关键词
PERT; Unascertained Number; Project Duration; Duration Risk; Credence;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
When the computation of project duration, the unascertained factor of project duration was leave out in traditional PERT network. And the computing result is a determined value. The determined result of project duration can not include the complete information, and usually can not match the project fact. In this paper, the uncertainty of project network is studied by unascertained number algorithm. And the project duration is contract with the credence. Firstly, the uncertainty of project duration is studied in the PERT network. Secondly, the unascertained number of the project duration in the network is determined by using the unascertained algorithm. Thirdly, both the finished credence and the accumulate credence can be worked out by the unascertained algorithm in the unascertained finish time of the network planning. Comparing with traditional PERT, the unascertained PERT is more scientific in the project practice. Finally, the availability and scientific of the unascertained PERT were proved by a case study.
引用
收藏
页码:2109 / 2112
页数:4
相关论文
共 50 条
  • [41] Impacts of uncertain project duration and asymmetric risk sensitivity information in project management
    Yang, Kai
    Zhao, Ruiqing
    Lan, Yanfei
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2016, 23 (04) : 749 - 774
  • [42] Risk assessment of gas disaster in tunnel construction based on unascertained measurement theory
    Zhai, Qiang
    Gu, Weihong
    Zhao, Yingying
    Journal of Railway Science and Engineering, 2021, 18 (03) : 803 - 812
  • [43] Landslide risk assessment based on combination weighting-unascertained measure theory
    Li Jun-xia
    Wang Chang-ming
    Wang Gang-cheng
    ROCK AND SOIL MECHANICS, 2013, 34 (02) : 468 - 474
  • [44] Study of Risk Control of ERP Project Based on ERM
    Zhang Yuesheng
    MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 1601 - 1604
  • [45] The study on Risk of Project Cost Based on The Experimental Simulation
    Zheng, Xie
    PROCEEDINGS OF 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA 2015), 2015, : 1044 - 1046
  • [46] Study on IT Project Investment Risk Evaluation Based on ANP
    Liu, BingSheng
    Ma, HuiYan
    Lin, Li
    ADVANCED RESEARCH ON MECHANICAL ENGINEERING, INDUSTRY AND MANUFACTURING ENGINEERING, PTS 1 AND 2, 2011, 63-64 : 557 - 560
  • [47] Study on the Evaluation of Community Informatization Level Based on Unascertained Measure Model
    Jing, Yang
    Hua, Jiang
    WMSO: 2008 INTERNATIONAL WORKSHOP ON MODELLING, SIMULATION AND OPTIMIZATION, PROCEEDINGS, 2009, : 69 - +
  • [48] Early Prediction of Project Duration: A Longitudinal Study
    Chen, Hong Long
    ENGINEERING MANAGEMENT JOURNAL, 2018, 30 (03) : 191 - 202
  • [49] Software Project Duration and Effort: An Empirical Study
    Evelyn J. Barry
    Tridas Mukhopadhyay
    Sandra A. Slaughter
    Information Technology and Management, 2002, 3 (1-2) : 113 - 136
  • [50] Study on the optimization of Public Construction project duration
    Luo, Fuzhou
    Shang, Jingyu
    Zhou, Yan
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1589 - 1592