Study on Project Duration Risk Based on Unascertained-PERT

被引:0
|
作者
Ma Lihua [1 ]
Wang Aifeng [1 ]
Yan Aifeng [1 ]
机构
[1] Hebei Univ Engn, Sch Econ & Management, Handan 056038, Peoples R China
关键词
PERT; Unascertained Number; Project Duration; Duration Risk; Credence;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
When the computation of project duration, the unascertained factor of project duration was leave out in traditional PERT network. And the computing result is a determined value. The determined result of project duration can not include the complete information, and usually can not match the project fact. In this paper, the uncertainty of project network is studied by unascertained number algorithm. And the project duration is contract with the credence. Firstly, the uncertainty of project duration is studied in the PERT network. Secondly, the unascertained number of the project duration in the network is determined by using the unascertained algorithm. Thirdly, both the finished credence and the accumulate credence can be worked out by the unascertained algorithm in the unascertained finish time of the network planning. Comparing with traditional PERT, the unascertained PERT is more scientific in the project practice. Finally, the availability and scientific of the unascertained PERT were proved by a case study.
引用
收藏
页码:2109 / 2112
页数:4
相关论文
共 50 条
  • [31] A Method for Evaluating the Risk of Ground Collapse in Goaf Based on Unascertained Measure
    Luo, Xiaoxia
    Wang, Zitong
    Fu, Jian
    Bai, Jichu
    Wang, Zihan
    Chen, Yuyang
    CONFERENCE PROCEEDINGS OF 2019 IEEE INTERNATIONAL CONFERENCE ON SIGNAL PROCESSING, COMMUNICATIONS AND COMPUTING (IEEE ICSPCC 2019), 2019,
  • [32] Risk assessment of vendors in supply chain management based on unascertained theory
    Liu, Jun'e
    Ma, Xintao
    Liu, Yongsheng
    PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 2, 2011, : 337 - 342
  • [33] Risk Analysis of Construction Schedule Based on PERT and MC Simulation
    Huang Jian-wen
    Wang Xing-xia
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 150 - +
  • [34] Project control based on a mutual application of pert and earned value management methods
    Mishakova, Anastasiia
    Vakhrushkina, Anna
    Murgul, Vera
    Sazonova, Tatiana
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 1812 - 1817
  • [35] Decision-making study on risk evaluation of earth and rock dams based on ANP unascertained measurement theory
    Li, Feng
    Zhang, Pengchao
    Li, Qian
    Shen, Zhuangyu
    Du, Xuewan
    NATURAL HAZARDS, 2024, 120 (02) : 1715 - 1753
  • [36] Project risk simulation under uncertain construction duration
    Hsu, KJ
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1277 - 1282
  • [37] Decision-making study on risk evaluation of earth and rock dams based on ANP unascertained measurement theory
    Feng Li
    Pengchao Zhang
    Qian Li
    Zhuangyu Shen
    Xuewan Du
    Natural Hazards, 2024, 120 : 1715 - 1753
  • [38] Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT)
    Habibi, Farhad
    Birgani, Omid Taghipour
    Koppelaar, Henk
    Radenovic, Stojan N.
    JOURNAL OF PROJECT MANAGEMENT, 2018, 3 (04) : 183 - 196
  • [39] Evaluation on Water Quality Risk Based on Unascertained Mathematics Theory of Wohushan Reservoir
    Du, Min
    Xu, ZhengHe
    Xu, XiuFeng
    ADVANCES IN COMPUTER SCIENCE, INTELLIGENT SYSTEM AND ENVIRONMENT, VOL 2, 2011, 105 : 663 - 668
  • [40] Evaluation on water quality risk based on unascertained mathematics theory of wohushan reservoir
    Du M.
    Xu Z.
    Xu X.
    Advances in Intelligent and Soft Computing, 2011, 105 : 663 - 668