Study on Project Duration Risk Based on Unascertained-PERT

被引:0
|
作者
Ma Lihua [1 ]
Wang Aifeng [1 ]
Yan Aifeng [1 ]
机构
[1] Hebei Univ Engn, Sch Econ & Management, Handan 056038, Peoples R China
关键词
PERT; Unascertained Number; Project Duration; Duration Risk; Credence;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
When the computation of project duration, the unascertained factor of project duration was leave out in traditional PERT network. And the computing result is a determined value. The determined result of project duration can not include the complete information, and usually can not match the project fact. In this paper, the uncertainty of project network is studied by unascertained number algorithm. And the project duration is contract with the credence. Firstly, the uncertainty of project duration is studied in the PERT network. Secondly, the unascertained number of the project duration in the network is determined by using the unascertained algorithm. Thirdly, both the finished credence and the accumulate credence can be worked out by the unascertained algorithm in the unascertained finish time of the network planning. Comparing with traditional PERT, the unascertained PERT is more scientific in the project practice. Finally, the availability and scientific of the unascertained PERT were proved by a case study.
引用
收藏
页码:2109 / 2112
页数:4
相关论文
共 50 条
  • [21] Building energy conservation project appraisal based on unascertained measurement theory
    Wang-aifeng
    Ma-lihua
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 8138 - 8141
  • [22] Risk Evaluation of Enterprise Informatization Based on the Unascertained Method
    Liu June
    Zeng Fanlei
    Han Zheng
    ADVANCED TECHNOLOGY IN TEACHING - PROCEEDINGS OF THE 2009 3RD INTERNATIONAL CONFERENCE ON TEACHING AND COMPUTATIONAL SCIENCE (WTCS 2009), VOL 1: INTELLIGENT UBIQUITIOUS COMPUTING AND EDUCATION, 2012, 116 : 77 - +
  • [23] M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics
    Ballesteros-Perez, Pablo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (09)
  • [24] Real estate investment risk assessment based on the unascertained measure
    Cao, Qingkui
    Yang, Yanli
    Li, Lijie
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 675 - 678
  • [25] Study on the Risk of Small and Medium-sized Enterprises Securitization Based on Unascertained Measure Model
    Ma Jibin
    Cheng Yi
    ISBIM: 2008 INTERNATIONAL SEMINAR ON BUSINESS AND INFORMATION MANAGEMENT, VOL 2, 2009, : 285 - +
  • [26] Prediction Method of Construction Project Cost Based on Rough Sets and Unascertained Measure
    Shi Huawang
    Cao Huishu
    CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 1139 - +
  • [27] Study of software reliability model based on unascertained theory
    Zhang, YQ
    Sun, SJ
    Proceedings of the 4th International Conference on Quality & Reliability, 2005, : 787 - 792
  • [28] PROJECT DURATION AND RISK FACTORS ON VIRTUAL PROJECTS
    Reed, April H.
    Knight, Linda V.
    JOURNAL OF COMPUTER INFORMATION SYSTEMS, 2013, 54 (01) : 75 - 83
  • [29] Fuzzy Analysis of Project Duration in Situations of Risk
    Gladysz, Barbara
    Kuchta, Dorota
    Skorupka, Dariusz
    Duchaczek, Artur
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2014 (ICNAAM-2014), 2015, 1648
  • [30] Approach for Setting Project Buffer with Engineering Materials Based on the Theory of Unascertained Rational Number
    Li, Wanqing
    Zhao, Zhe
    Meng, Lingyu
    ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEM AND MATERIAL ENGINEERING, 2012, 459 : 364 - +