Study on Project Duration Risk Based on Unascertained-PERT

被引:0
|
作者
Ma Lihua [1 ]
Wang Aifeng [1 ]
Yan Aifeng [1 ]
机构
[1] Hebei Univ Engn, Sch Econ & Management, Handan 056038, Peoples R China
关键词
PERT; Unascertained Number; Project Duration; Duration Risk; Credence;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
When the computation of project duration, the unascertained factor of project duration was leave out in traditional PERT network. And the computing result is a determined value. The determined result of project duration can not include the complete information, and usually can not match the project fact. In this paper, the uncertainty of project network is studied by unascertained number algorithm. And the project duration is contract with the credence. Firstly, the uncertainty of project duration is studied in the PERT network. Secondly, the unascertained number of the project duration in the network is determined by using the unascertained algorithm. Thirdly, both the finished credence and the accumulate credence can be worked out by the unascertained algorithm in the unascertained finish time of the network planning. Comparing with traditional PERT, the unascertained PERT is more scientific in the project practice. Finally, the availability and scientific of the unascertained PERT were proved by a case study.
引用
收藏
页码:2109 / 2112
页数:4
相关论文
共 50 条
  • [1] Research on the risk evaluation model of project duration based on PERT and Fuzzy Theory
    School of Manag., Xi'an Univ. of Arch. and Tech., Xi'an 710055, China
    Xi'an Jianzhu Keji Daxue Xuebao, 2007, 4 (547-550):
  • [2] Research on Risk Degree of Project Duration in U-PERT Network
    Ma, Lihua
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 4, PROCEEDINGS, 2009, : 6 - 9
  • [3] Study of Schedule Risk for Resource-Constrained Project Based on Improved PERT
    Zhang Yun-ning
    Sun Xixi
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1333 - 1337
  • [4] BOUNDING THE DISTRIBUTION OF PROJECT DURATION IN PERT NETWORKS
    KAMBUROWSKI, J
    OPERATIONS RESEARCH LETTERS, 1992, 12 (01) : 17 - 22
  • [5] The Application of Unascertained Mathematics in Project Risk Management
    Li, Wanqing
    Yang, Zixue
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 416 - 419
  • [6] COMPUTING THE PROBABILITY-DISTRIBUTION OF PROJECT DURATION IN A PERT NETWORK
    HAGSTROM, JN
    NETWORKS, 1990, 20 (02) : 231 - 244
  • [7] The Effects of Different Activity Distributions on Project Duration in PERT Networks
    Hajdu, Miklos
    Bokor, Orsolya
    SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 766 - 775
  • [8] Computing bounds on project duration distributions for stochastic PERT networks
    Iida, T
    NAVAL RESEARCH LOGISTICS, 2000, 47 (07) : 559 - 580
  • [9] Risk analysis of construction duration based on improved probability analysis method in PERT
    Huang JianWen
    Wang XingXia
    Zhou YiHong
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 295 - 299
  • [10] study of project duration risk in the network diagram based on matrix algorithm
    Li, Tao
    Qiu, Wenge
    Wang, Lichuan
    Man, Shuai
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3401 - +