Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty

被引:17
|
作者
Ma, Shoufeng [1 ]
Li, Hongming [1 ]
Zhu, Ning [1 ]
Fu, Chenyi [1 ]
机构
[1] Tianjin Univ, Inst Syst Engn, Coll Management & Econ, Tianjin 300072, Peoples R China
基金
中国国家自然科学基金;
关键词
Unidirectional quay crane scheduling; Uncertainty; Two-stage stochastic programming; Integer L-shaped method; Simulated annealing algorithm; GENETIC ALGORITHM; BERTH ALLOCATION; LINEAR-PROGRAMS; OPTIMIZATION; 1ST-STAGE; BRANCH;
D O I
10.1007/s10951-020-00661-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Quay crane scheduling is a key aspect of container terminal operation, which can be regarded as a decision-making process with uncertainty. Each task involves stochastic loading and unloading operation times owing to the existence of uncertainty. In this study, we investigate the unidirectional quay crane scheduling problem for a stochastic processing time, which requires that all the quay cranes move in the same direction either from bow to stern, or vice versa, throughout the planning horizon. The problem is formulated as a two-stage stochastic mixed-integer programming model, where the binary first-stage decision variables correspond to the assignment of tasks to quay cranes, and the mixed-integer second-stage decision variables are related to the generation of detailed schedules. To make the model solvable, we develop an alternative equivalent reformulation with a special structure that involves binary variables in the first stage and continuous variables in the second stage. To solve this reformulated model, an integer L-shaped method is presented for small-size instances, and a simulated annealing algorithm is presented for large-size instances to obtain near-optimal solutions. Numerical experiments show that the integer L-shaped method and simulated annealing algorithm could efficiently solve the unidirectional quay crane scheduling problem with uncertainty. The results also indicate that the stochastic model has distinct advantages in terms of shortening the completion time of vessels and improving the service level of container terminals compared with the expected value problem solutions.
引用
收藏
页码:137 / 174
页数:38
相关论文
共 50 条
  • [41] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [42] An efficient genetic algorithm for solving the quay crane scheduling problem
    Kayeshgar, Narges
    Huynh, Nathan
    Rahimian, Saeed Khaleghi
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (18) : 13108 - 13117
  • [43] The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints
    Al-Dhaheri, Noura
    Jebali, Aida
    Diabat, Ali
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 94 : 230 - 244
  • [44] A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach
    Fu, Yi-Min
    Diabat, Ali
    Tsai, I-Tsung
    EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (15) : 6959 - 6965
  • [45] A stochastic programming approach to the physician staffing and scheduling problem
    Marchesi, Janaina F.
    Hamacher, Silvio
    Fleck, Julia L.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 142
  • [46] A Stochastic programming approach to the airline crew scheduling problem
    Yen, JW
    Birge, JR
    TRANSPORTATION SCIENCE, 2006, 40 (01) : 3 - 14
  • [47] A Bayesian stochastic programming approach to an employee scheduling problem
    Morton, DP
    Popova, E
    IIE TRANSACTIONS, 2004, 36 (02) : 155 - 167
  • [48] A stochastic programming approach for operating theatre scheduling under uncertainty
    Bruni, M. E.
    Beraldi, P.
    Conforti, D.
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2015, 26 (01) : 99 - 119
  • [49] A unified approach for the evaluation of quay crane scheduling models and algorithms
    Meisel, Frank
    Bierwirth, Christian
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (03) : 683 - 693
  • [50] Quay crane scheduling problem with considering tidal impact and fuel consumption
    Shucheng Yu
    Shuaian Wang
    Lu Zhen
    Flexible Services and Manufacturing Journal, 2017, 29 : 345 - 368