Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty

被引:17
|
作者
Ma, Shoufeng [1 ]
Li, Hongming [1 ]
Zhu, Ning [1 ]
Fu, Chenyi [1 ]
机构
[1] Tianjin Univ, Inst Syst Engn, Coll Management & Econ, Tianjin 300072, Peoples R China
基金
中国国家自然科学基金;
关键词
Unidirectional quay crane scheduling; Uncertainty; Two-stage stochastic programming; Integer L-shaped method; Simulated annealing algorithm; GENETIC ALGORITHM; BERTH ALLOCATION; LINEAR-PROGRAMS; OPTIMIZATION; 1ST-STAGE; BRANCH;
D O I
10.1007/s10951-020-00661-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Quay crane scheduling is a key aspect of container terminal operation, which can be regarded as a decision-making process with uncertainty. Each task involves stochastic loading and unloading operation times owing to the existence of uncertainty. In this study, we investigate the unidirectional quay crane scheduling problem for a stochastic processing time, which requires that all the quay cranes move in the same direction either from bow to stern, or vice versa, throughout the planning horizon. The problem is formulated as a two-stage stochastic mixed-integer programming model, where the binary first-stage decision variables correspond to the assignment of tasks to quay cranes, and the mixed-integer second-stage decision variables are related to the generation of detailed schedules. To make the model solvable, we develop an alternative equivalent reformulation with a special structure that involves binary variables in the first stage and continuous variables in the second stage. To solve this reformulated model, an integer L-shaped method is presented for small-size instances, and a simulated annealing algorithm is presented for large-size instances to obtain near-optimal solutions. Numerical experiments show that the integer L-shaped method and simulated annealing algorithm could efficiently solve the unidirectional quay crane scheduling problem with uncertainty. The results also indicate that the stochastic model has distinct advantages in terms of shortening the completion time of vessels and improving the service level of container terminals compared with the expected value problem solutions.
引用
收藏
页码:137 / 174
页数:38
相关论文
共 50 条
  • [21] A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
    Legato, Pasquale
    Trunfio, Roberto
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2014, 12 (02): : 123 - 156
  • [22] Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model
    Rodrigues, Filipe
    Agra, Agostinho
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (02) : 721 - 748
  • [23] A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem
    Fu, Yi-Min
    Diabat, Ali
    APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) : 1194 - 1201
  • [24] A Novel Proactive-Reactive Scheduling Approach for the Quay Crane Scheduling Problem: A VUCA Perspective
    Chargui, Kaoutar
    Zouadi, Tarik
    Sreedharan, V. Raja
    El Fallahi, Abdellah
    Reghioui, Mohamed
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2023, 70 (07) : 2594 - 2607
  • [25] Simulated Annealing Algorithm for the Quay Crane Scheduling Problem
    Liu, Yan-Na
    Wang, Rui
    Zhang, Xiao-Yu
    Li, Chang-Guo
    Zhong, Min
    Li, Yu-Hao
    PROCEEDINGS OF THE 38TH CHINESE CONTROL CONFERENCE (CCC), 2019, : 2307 - 2311
  • [26] A tabu search heuristic for the quay crane scheduling problem
    Sammarra, Marcello
    Cordeau, Jean-Francois
    Laporte, Gilbert
    Monaco, M. Flavia
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 327 - 336
  • [27] Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem
    Exposito Izquierdo, Christopher
    Gonazalez Velarde, Jose Luis
    Melian Batista, Belen
    Marcos Moreno-Vega, J.
    NATURE INSPIRED COOPERATIVE STRATEGIES FOR OPTIMIZATION (NICSO 2011), 2011, 387 : 183 - +
  • [28] A tabu search heuristic for the quay crane scheduling problem
    Marcello Sammarra
    Jean-François Cordeau
    Gilbert Laporte
    M. Flavia Monaco
    Journal of Scheduling, 2007, 10 : 327 - 336
  • [29] A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty
    Al-Dhaheri, Noura
    Jebali, Aida
    Diabat, Ali
    SIMULATION MODELLING PRACTICE AND THEORY, 2016, 66 : 122 - 138
  • [30] A Column Generation Method for Quay Crane Scheduling Problem
    Zheng, Kewei
    Lu, Zhiqiang
    Sun, Xiaoming
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 81 - 85