Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty

被引:17
|
作者
Ma, Shoufeng [1 ]
Li, Hongming [1 ]
Zhu, Ning [1 ]
Fu, Chenyi [1 ]
机构
[1] Tianjin Univ, Inst Syst Engn, Coll Management & Econ, Tianjin 300072, Peoples R China
基金
中国国家自然科学基金;
关键词
Unidirectional quay crane scheduling; Uncertainty; Two-stage stochastic programming; Integer L-shaped method; Simulated annealing algorithm; GENETIC ALGORITHM; BERTH ALLOCATION; LINEAR-PROGRAMS; OPTIMIZATION; 1ST-STAGE; BRANCH;
D O I
10.1007/s10951-020-00661-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Quay crane scheduling is a key aspect of container terminal operation, which can be regarded as a decision-making process with uncertainty. Each task involves stochastic loading and unloading operation times owing to the existence of uncertainty. In this study, we investigate the unidirectional quay crane scheduling problem for a stochastic processing time, which requires that all the quay cranes move in the same direction either from bow to stern, or vice versa, throughout the planning horizon. The problem is formulated as a two-stage stochastic mixed-integer programming model, where the binary first-stage decision variables correspond to the assignment of tasks to quay cranes, and the mixed-integer second-stage decision variables are related to the generation of detailed schedules. To make the model solvable, we develop an alternative equivalent reformulation with a special structure that involves binary variables in the first stage and continuous variables in the second stage. To solve this reformulated model, an integer L-shaped method is presented for small-size instances, and a simulated annealing algorithm is presented for large-size instances to obtain near-optimal solutions. Numerical experiments show that the integer L-shaped method and simulated annealing algorithm could efficiently solve the unidirectional quay crane scheduling problem with uncertainty. The results also indicate that the stochastic model has distinct advantages in terms of shortening the completion time of vessels and improving the service level of container terminals compared with the expected value problem solutions.
引用
收藏
页码:137 / 174
页数:38
相关论文
共 50 条
  • [31] A Multi-Vessel Quay Crane Scheduling Problem
    AlAwar, Kalthoom
    Alawani, Mohamed
    Al Jaberi, Shamma
    2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,
  • [32] Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: A robust exact decomposition
    Chargui, Kaoutar
    Zouadi, Tarik
    Sreedharan, V. Raja
    COMPUTERS & OPERATIONS RESEARCH, 2023, 156
  • [33] A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    Erera, Alan L.
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 2915 - 2928
  • [34] Research on Quay Crane Scheduling Problem By Hybrid Genetic Algorithm
    Liang, Cheng ji
    Huang, You fang
    Yang, Yang
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 2131 - +
  • [35] Solving for a Quay Crane Scheduling and Assignment Problem by Simulated Annealing
    Tavakkoli-Moghaddam, Reza
    Taheri, Farid
    Bazzazi, Mohammad
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 326 - 333
  • [36] A Hybrid Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem
    Perez-Rodriguez, Ricardo
    MATHEMATICAL AND COMPUTATIONAL APPLICATIONS, 2021, 26 (03)
  • [37] A workload balancing genetic algorithm for the quay crane scheduling problem
    Chung, S. H.
    Chan, Felix T. S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (16) : 4820 - 4834
  • [38] Modeling and solution of the joint quay crane and truck scheduling problem
    Tang, Lixin
    Zhao, Jiao
    Liu, Jiyin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 236 (03) : 978 - 990
  • [39] A genetic algorithm for solving the quay crane scheduling and allocation problem
    Olteanu, S.
    Costescu, D.
    Rusca, A.
    Oprea, C.
    MODTECH INTERNATIONAL CONFERENCE - MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING VI (MODTECH 2018), 2018, 400
  • [40] Hybrid Estimation of Distribution Algorithm for the Quay Crane Scheduling Problem
    Exposito-Izquierdo, Christopher
    Luis Gonzalez-Velarde, Jose
    Melian-Batista, Belen
    Marcos Moreno-Vega, J.
    APPLIED SOFT COMPUTING, 2013, 13 (10) : 4063 - 4076