Accelerated construction for a bridge in rural Texas

被引:0
|
作者
Hyzak, Michael [1 ]
Tang, Benjamin [2 ]
Detwiler, Rachel J.
机构
[1] Texas Dept Transportat TxDOT, Bridge Div, Austin, TX USA
[2] Oregon Dept Transportat, Salem, OR USA
来源
PCI JOURNAL | 2013年
关键词
ABC; accelerated bridge construction; analytical hierarchy; bridge replacement; decision making;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper illustrates the use of a hierarchical decision tool to evaluate whether to use accelerated bridge construction (ABC) to replace a bridge in a rural area. County Route EE over Gageby Creek in the Texas Panhandle carries a great deal of truck traffic related to the oil and gas industry in the area. The lack of suitable alternate routes strongly influenced the decision to use ABC. Because customer service was heavily weighted compared with other high-level criteria, such as direct and indirect costs, ABC was the favored alternative. This example shows how ABC may prove appropriate even for a simple bridge in an isolated area.
引用
收藏
页码:32 / 36
页数:5
相关论文
共 50 条
  • [21] Review of Accelerated Bridge Construction Systems for Bridge Superstructures and Their Adaptability for Cold Weather
    Aurier, Louis
    Hassan, Munzer
    Jaworski, Jan
    Guizani, Lotfi
    CIVILENG, 2023, 4 (01): : 83 - 104
  • [22] Precast steel-UHPC lightweight composite bridge for accelerated bridge construction
    Deng, Shuwen
    Shao, Xudong
    Zhao, Xudong
    Wang, Yang
    Wang, Yan
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2021, 15 (02) : 364 - 377
  • [24] Accelerated Bridge Construction in Challenging Geology: The Geotechnical Aspects of the Veranda Street Bridge Replacement
    Juzwin, Joseph C.
    Zwetchkenbaum, Joseph D.
    Krusinski, Laura
    GEO-CONGRESS 2024-GEOTECHNICAL SYSTEMS, 2024, : 171 - 185
  • [25] Accelerated bridge construction projects using high performance concrete
    Akhnoukh, Amin K.
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2020, 12
  • [26] Accelerated bridge construction in Washington State: From research to practice
    Khaleghi, Bijan
    Schultz, Eric
    Seguirant, Stephen
    Marsh, Lee
    Haraldsson, Olafur
    Eberhard, Marc
    Stanton, John
    PCI JOURNAL, 2012, : 34 - 49
  • [27] Concrete-Filled Steel Tubes for Accelerated Bridge Construction
    Roeder, Charles W.
    Lehman, Dawn E.
    Stephens, Max
    TRANSPORTATION RESEARCH RECORD, 2014, (2406) : 49 - 58
  • [28] Investigation of Grouted Coupler Connection Details for Accelerated Bridge Construction
    Phares, Brent
    Lee, Yoon-Si
    Hosteng, Travis K.
    Nelson, Jim
    TRANSPORTATION RESEARCH RECORD, 2021, 2675 (08) : 562 - 569
  • [29] Unbonded Pretensioned Columns for Accelerated Bridge Construction in Seismic Regions
    Davis, Phillip M.
    Janes, Todd M.
    Haraldsson, Olafur S.
    Eberhard, Marc O.
    Stanton, John F.
    JOURNAL OF BRIDGE ENGINEERING, 2017, 22 (05)
  • [30] Selection of Durable Closure Pour Materials for Accelerated Bridge Construction
    Zhu, Peng
    Ma, Zhongguo John
    JOURNAL OF BRIDGE ENGINEERING, 2010, 15 (06) : 695 - 704