Accelerated construction for a bridge in rural Texas

被引:0
|
作者
Hyzak, Michael [1 ]
Tang, Benjamin [2 ]
Detwiler, Rachel J.
机构
[1] Texas Dept Transportat TxDOT, Bridge Div, Austin, TX USA
[2] Oregon Dept Transportat, Salem, OR USA
来源
PCI JOURNAL | 2013年
关键词
ABC; accelerated bridge construction; analytical hierarchy; bridge replacement; decision making;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper illustrates the use of a hierarchical decision tool to evaluate whether to use accelerated bridge construction (ABC) to replace a bridge in a rural area. County Route EE over Gageby Creek in the Texas Panhandle carries a great deal of truck traffic related to the oil and gas industry in the area. The lack of suitable alternate routes strongly influenced the decision to use ABC. Because customer service was heavily weighted compared with other high-level criteria, such as direct and indirect costs, ABC was the favored alternative. This example shows how ABC may prove appropriate even for a simple bridge in an isolated area.
引用
收藏
页码:32 / 36
页数:5
相关论文
共 50 条
  • [31] Low-Damage Seismic Design for Accelerated Bridge Construction
    Mashal, Mustafa
    Palermo, Alessandro
    JOURNAL OF BRIDGE ENGINEERING, 2019, 24 (07)
  • [32] Accelerated bridge construction in Washington state: From research to practice
    Khaleghi, Bijan
    Schultz, Eric
    Seguirant, Stephen
    Marsh, Lee
    Haraldsson, Olafur
    Eberhard, Marc
    Stanton, John
    Khaleghi, B., 2012, Precast/Prestressed Concrete Institute (57): : 34 - 49
  • [33] Washington State Department of Transportation Plan for Accelerated Bridge Construction
    Khaleghi, Bijan
    TRANSPORTATION RESEARCH RECORD, 2010, (2200) : 3 - 11
  • [34] A New Precast Concrete Deck System for Accelerated Bridge Construction
    Morcous, George
    Jaber, Fouad
    Volz, Jason
    FACING THE CHALLENGES IN STRUCTURAL ENGINEERING, 2018, : 229 - 241
  • [35] A New Precast Concrete Deck System for Accelerated Bridge Construction
    Morcous, George
    Hatami, Afshin
    Jaber, Fouad
    ADVANCES IN CIVIL ENGINEERING MATERIALS, 2018, 7 (03): : 303 - 327
  • [36] SELECTION OF DURABLE CLOSURE POUR MATERIALS FOR ACCELERATED BRIDGE CONSTRUCTION
    Zhu, Peng
    Ma, Zhongguo John
    PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 761 - 769
  • [37] Accelerated Bridge Construction Case: A Novel Low-Carbon and Assembled Composite Bridge Scheme
    Kang, Ling
    Xu, Jinhua
    Mu, Tingmin
    Wang, Huan
    Zhao, Ping
    BUILDINGS, 2024, 14 (06)
  • [38] Durable Bridge Columns using Stay-In-Place UHPC Shells for Accelerated Bridge Construction
    Caluk, Nerma
    Mantawy, Islam
    Azizinamini, Atorod
    INFRASTRUCTURES, 2019, 4 (02)
  • [39] Leveraging Alternative Technical Concept for Contract Delivery of Accelerated Bridge Construction
    Pradhananga, Piyush
    Elzomor, Mohamed
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 89 - 99
  • [40] Development of the northeast extreme tee (NEXT) beam for accelerated bridge construction
    Culmo, Michael P.
    Seraderian, Rita L.
    PCI JOURNAL, 2010, : 86 - 101