Accelerated bridge construction projects using high performance concrete

被引:17
|
作者
Akhnoukh, Amin K. [1 ]
机构
[1] East Carolina Univ, Construct Management Dept, 343B Rawl Bldg,Mail Stop 307, Greenville, NC 27858 USA
关键词
Accelerated bridge construction (ABC); Prefabricated bridge elements and systems (PBES); High performance concrete (HPC); Girders; Federal Highway Administration (FHWA);
D O I
10.1016/j.cscm.2019.e00313
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The National Bridge Inventory (NBI) of the United States includes more than 600,000 highway bridges. Approximately 25 % of the nation's inventory is structurally deficient or functionally obsolete. Currently, the Federal Highway Administration (FHWA) is investigating different alternatives to build new bridge with longer life-span, lower maintenance, and repair needs. Currently, the FHWA is successfully using accelerated bridge construction (ABC) techniques to expedite the construction of new bridges, and minimize material, labor, and equipment cost. In this research, the ABC of new bridges using prefabricated bridge elements and systems (PBES) is discussed, including the fabrication of precast/prestressed elements using an economic high performance concrete (HPC) mix, developed using local construction materials. The successful use of HPC in fabricating PBES used in ABC techniques allows the FHWA to construct new bridges under current budget restraints. This improves the overall rating of the bridge network within the United States. Published by Elsevier Ltd.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Implementing ultra-high-performance concrete for accelerated bridge construction in New York
    Royce, Mathew
    PCI Journal, 2014, 59 (04): : 38 - 47
  • [2] Implementing ultra-high-performance concrete for accelerated bridge construction in New York
    Royce, Mathew
    PCI JOURNAL, 2014, : 38 - 47
  • [3] High Performance Materials for Concrete Bridge Construction
    Morcous, George
    Maguire, Marc
    Tadros, Maher K.
    RECENT RESEARCH IN SUSTAINABLE STRUCTURES, 2020, : 48 - 63
  • [4] Design of Ultrahigh-Performance Concrete Waffle Deck for Accelerated Bridge Construction
    Aaleti, Sriram
    Sritharan, Sri
    TRANSPORTATION RESEARCH RECORD, 2014, (2406) : 12 - 22
  • [5] Whiteman Creek Bridge: A synthesis of accelerated bridge construction, ultra-high-performance concrete, and fiber-reinforced polymer
    Young, Wade F.
    Boparai, Jasan
    PCI JOURNAL, 2013, : 37 - 47
  • [6] Polymer Concrete for Bridge Deck Closure Joints in Accelerated Bridge Construction
    Mantawy, Islam
    Chennareddy, Rahulreddy
    Genedy, Moneeb
    Taha, Mahmoud Reda
    INFRASTRUCTURES, 2019, 4 (02)
  • [7] First application of high performance concrete for construction of bridge in Saxony
    Gunther, Lutz
    Konig, Gert
    Opitz, Valentin
    Schmidt, Detlef
    Tue, Nguyen
    Bautechnik, 2000, 77 (10) : 718 - 724
  • [8] New Connection Detail to Connect Precast Column to Cap Beam using Ultra-High-Performance Concrete in Accelerated Bridge Construction Applications
    Shafieifar, Mohamadreza
    Farzad, Mahsa
    Azizinamini, Atorod
    TRANSPORTATION RESEARCH RECORD, 2018, 2672 (41) : 207 - 220
  • [9] Construction and Performance Monitoring of Innovative Ultra-High-Performance Concrete Bridge
    Kim, Haena
    Moon, Byungkyu
    Hu, Xinyu
    Lee, Hosin
    Ryu, Gum-Sung
    Koh, Kyung-Taek
    Joh, Changbin
    Kim, Byung-Suk
    Keierleber, Brian
    INFRASTRUCTURES, 2021, 6 (09)
  • [10] Concrete-Filled Steel Tubes for Accelerated Bridge Construction
    Roeder, Charles W.
    Lehman, Dawn E.
    Stephens, Max
    TRANSPORTATION RESEARCH RECORD, 2014, (2406) : 49 - 58