Risk Analysis Model in Hydro Engineering Construction Considering Discharge Control of Upriver Reservoir

被引:0
|
作者
Huang, Qiang [1 ]
Liu, Zhao [1 ]
Zhang, Hongbo [1 ]
Ma, Yongsheng [1 ]
机构
[1] Xian Univ Technol, Xian 710048, Peoples R China
关键词
Water project; Composite probability; Risk analysis model; Hydrological uncertainty;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The diversion criteria could not be extremely high in construction period of a water project by reason of diversion scale, costs and schedule etc. Therefore, it is an important strategy to decrease project cost and construction risk considering the function of discharge control of upriver reservoir. An analysis model for construction risk considering both discharge control of upriver reservoir and the interval inflow were established, furthermore, by taken a real project for example, the model was analyzed and solved by using composite probability method. The result indicates that the method could decrease the construction risk of the project effectively, and the energy output loss of the upriver reservoir could be neglectable and the benefits from risk reduction could be significant if operation was reasonable.
引用
收藏
页码:17 / 20
页数:4
相关论文
共 50 条
  • [21] Risk analysis of flood forecast and pre-discharge operation of reservoir
    Chen, Wei
    Wen, Tian-Fu
    Feng, Ping
    Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2008, 41 (09): : 1068 - 1072
  • [22] Interactive Probabilistic Risk Analysis for Construction Engineering and Management
    Du, Jing
    Hatipkarasulu, Yilmaz
    Liu, Rui
    2014 ASEE ANNUAL CONFERENCE, 2014,
  • [23] Research on risk prediction and prevention and control measures of economic management of engineering construction based on econometric model
    Yang J.
    Li Z.
    Yang G.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [24] The risk assessment model of BT construction engineering project financing
    Luo Fu-zhou
    Gao Hong-yuan
    ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 169 - 173
  • [25] The control of engineering project cost management of construction enterprise based on lean model experimental analysis
    Yan, Liu
    Peng, Zhang
    2014 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA), 2014, : 983 - 986
  • [26] ANALYSIS OF A CHANCE-CONSTRAINED RESERVOIR CONTROL MODEL
    SNIEDOVICH, M
    WATER RESOURCES RESEARCH, 1980, 16 (05) : 849 - 853
  • [27] STUDY ON RISK CONTROL OF WATER INRUSH IN TUNNEL CONSTRUCTION PERIOD CONSIDERING UNCERTAINTY
    Wen, Zhu
    Xia, Yuanpu
    Ji, Yuguo
    Liu, Yiming
    Xiong, Ziming
    Lu, Hao
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (08) : 757 - 772
  • [28] Construction Risk Analysis of Subgrade Engineering in Perilous Mountainous Areas
    Bao, Xueying
    Li, Haiwen
    Journal of Railway Engineering Society, 2022, 39 (07) : 109 - 115
  • [29] Multicriteria optimal operation of a microgrid considering risk analysis, renewable resources, and model predictive control
    Zafra-Cabeza, Ascension
    Velarde, Pablo
    Maestre, Jose M.
    OPTIMAL CONTROL APPLICATIONS & METHODS, 2020, 41 (01): : 94 - 106
  • [30] Research on risk analysis and risk decision-making of progress of engineering construction
    Wang, X.J.
    2001, Wuhan University Journals Press (34):