Risk Analysis Model in Hydro Engineering Construction Considering Discharge Control of Upriver Reservoir

被引:0
|
作者
Huang, Qiang [1 ]
Liu, Zhao [1 ]
Zhang, Hongbo [1 ]
Ma, Yongsheng [1 ]
机构
[1] Xian Univ Technol, Xian 710048, Peoples R China
关键词
Water project; Composite probability; Risk analysis model; Hydrological uncertainty;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The diversion criteria could not be extremely high in construction period of a water project by reason of diversion scale, costs and schedule etc. Therefore, it is an important strategy to decrease project cost and construction risk considering the function of discharge control of upriver reservoir. An analysis model for construction risk considering both discharge control of upriver reservoir and the interval inflow were established, furthermore, by taken a real project for example, the model was analyzed and solved by using composite probability method. The result indicates that the method could decrease the construction risk of the project effectively, and the energy output loss of the upriver reservoir could be neglectable and the benefits from risk reduction could be significant if operation was reasonable.
引用
收藏
页码:17 / 20
页数:4
相关论文
共 50 条
  • [41] Deriving the optimal refill rule for multi-purpose reservoir considering flood control risk
    Li, Yu
    Guo, Shenglian
    Quo, Jiali
    Wang, Yun
    Li, Tianyuan
    Chen, Jionghong
    JOURNAL OF HYDRO-ENVIRONMENT RESEARCH, 2014, 8 (03) : 248 - 259
  • [42] Construction of Integration Laboratory System for Control Engineering based on CDIO Model
    Kang, Chaohai
    Huo, Fengcai
    Ren, Weijian
    Yu, Di
    PROCEEDINGS OF THE 2015 3D INTERNATIONAL CONFERENCE ON ADVANCED INFORMATION AND COMMUNICATION TECHNOLOGY FOR EDUCATION, 2015, 11 : 455 - 458
  • [43] Stochastic Programming with a Joint Chance Constraint Model for Reservoir Refill Operation Considering Flood Risk
    Xu, Bin
    Boyce, Scott E.
    Zhang, Yu
    Liu, Qiang
    Guo, Le
    Zhong, Ping-An
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2017, 143 (01)
  • [44] Research on Risk Analysis and Control of Construction Supply Chain
    Gao, Fuzi
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT (ICOSCM 2010), 2010, 4 : 889 - 892
  • [45] Safety Risk Analysis and Control Of Subsea Tunnel Construction
    Zhang Ding-li
    Li Bing
    Fang Qian
    Li Peng-fei
    ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 334 - 339
  • [46] Sensitivity and uncertainty analysis of mesoscale model downscaled hydro-meteorological variables for discharge prediction
    Srivastava, Prashant K.
    Han, Dawei
    Rico-Ramirez, Miguel A.
    Islam, Tanvir
    HYDROLOGICAL PROCESSES, 2014, 28 (15) : 4419 - 4432
  • [47] System Dynamics Analysis of Construction Safety Risk considering Existing Railway Lines
    Zeng, Xiaoye
    Huang, Naixin
    Han, Yang
    Yin, Yang
    Huang, Jianling
    Computational Intelligence and Neuroscience, 2022, 2022
  • [48] System Dynamics Analysis of Construction Safety Risk considering Existing Railway Lines
    Zeng, Xiaoye
    Huang, Naixin
    Han, Yang
    Yin, Yang
    Huang, Jianling
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [49] Quantitative Risk Analysis for Construction Projects Considering Risks Correlations and Fuzzy Logic
    Cuadros-Lopez, Alvaro Julio
    Arevalo, Nicolle Alexandra Cruces
    Ortiz, Claudia
    UIS INGENIERIAS, 2024, 23 (01):
  • [50] An MILP based optimization model for reservoir flood control operation considering spillway gate scheduling
    Su, Chengguo
    Wang, Peilin
    Yuan, Wenlin
    Cheng, Chuntian
    Zhang, Taiheng
    Yan, Denghua
    Wu, Zening
    Journal of Hydrology, 2022, 613