Research on risk prediction and prevention and control measures of economic management of engineering construction based on econometric model

被引:0
|
作者
Yang J. [1 ]
Li Z. [1 ]
Yang G. [1 ]
机构
[1] Economic and Technological Research Institute, State Grid Heilongjiang Electric Power Co., Ltd., Heilongjiang, Harbin
关键词
Chi-square distribution; Econometric modeling; Least squares; Parametric linear constraint; Risk prediction;
D O I
10.2478/amns.2023.2.00758
中图分类号
学科分类号
摘要
To provide construction units with comprehensive and accurate information to assist in decision-making, this paper utilizes econometric models to use the Internet for management monitoring and engineering construction schedule scheduling. The parametric linearity constraint test method is set up, production function examples are established for engineering tests, and statistics are approximated to obey degrees of freedom and cardinal distribution. To obtain the inverse of the estimated information matrix, the least squares method is employed to maximize the engineering construction expression. The engineering economic management error value is found to be the lowest value of 0.84, the maximum value of elasticity coefficient is 0.379, and the minimum value of covariance is 0.185. To fully improve the risk prediction capability of engineering construction, econometric modeling techniques must be integrated. © 2023 Jingsi Yang, Zhenhai Li and Ge Yang, published by Sciendo.
引用
收藏
相关论文
共 50 条
  • [1] Application Research of Construction Engineering Quality Risk Innovation Management Model
    Deng Jianxun
    Zhou Jian
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 2, PROCEEDINGS, 2009, : 544 - +
  • [2] Research on Risk Management of Railway Engineering Construction
    Wang Lin
    Li Yaqi
    Wang Enmao
    ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 174 - 180
  • [3] Research on Risk Control Measures in the Process of Project Construction
    Tian Lingang
    Song Yongjia
    Huang Xiang
    Peng Yuanchun
    Liu Zhi
    PROCEEDINGS OF 2010 INTERNATIONAL SYMPOSIUM ON CONSTRUCTION ECONOMY AND MANAGEMENT (ISCEM2010), 2010, : 114 - 118
  • [4] Construction of Management System for Coordination Degree of Regional Economic Development Based on the Fusion of Spatial Econometric Model
    Yin Xiuying
    2018 10TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA), 2018, : 489 - 492
  • [5] Research on full cycle cost Prediction Model of Construction Engineering based on BIM
    Zhang Xiao-Seng
    2018 FIRST INTERNATIONAL CONFERENCE ON ENVIRONMENT PREVENTION AND POLLUTION CONTROL TECHNOLOGY (EPPCT 2018), 2018, 199
  • [6] A Research of Engineering, Construction Based on Credit Risk
    Lu Shi-bao
    Huang Qiang
    Zhang Yong-yong
    Sun Dong-yong
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 184 - 189
  • [7] Undergraduate research mentoring model in construction engineering and management
    Abudayyeh, O
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2003, 129 (01) : 65 - 69
  • [8] Engineering Project Risk Evaluation System Construction and Research Based on BP Model
    Zhang Jianwei
    Ye Donglu
    Ye Guanchan
    Zhou Jingzhi
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 2050 - +
  • [9] Research Based on Information Fusion of Safety Risks Prediction and Control Management in Construction
    Zhao Ping
    Zhang Hu
    MATERIALS ENGINEERING FOR ADVANCED TECHNOLOGIES, PTS 1 AND 2, 2011, 480-481 : 1502 - 1506
  • [10] Risk Prevention and Control Measures in Highway Design and Construction Turnkey Project
    Peng, Junlong
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 3814 - 3819