Solution approaches for the soft drink integrated production lot sizing and scheduling problem

被引:86
|
作者
Ferreira, Deisemara [1 ]
Morabito, Reinaldo [1 ]
Rangel, Socorro [2 ]
机构
[1] Univ Fed Sao Carlos, Dept Prod Engn, BR-13565905 Sao Carlos, SP, Brazil
[2] Sao Paulo State Univ, UNESP, BR-15054000 Sao Jose Do Rio Preto, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
Lot sizing; Scheduling; Soft drink industry; Mixed integer programming; Relax-and-fix heuristic; HEURISTICS; SEARCH;
D O I
10.1016/j.ejor.2008.03.035
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:697 / 706
页数:10
相关论文
共 50 条
  • [41] Optimization models for a lot sizing and scheduling problem on parallel production lines that share scarce resources
    Alves de Oliveira Soler, Willy
    Oliveira Santos, Maristela
    Rangel, Socorro
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (03) : 1949 - 1970
  • [42] A New Algorithm for the Capacitated Lot-sizing and Scheduling Problem
    Ma, Jia
    Shi, Gang
    LEMLID: 2008 NORTHEAST ASIA LOGISTICS ENGINEERING AND MODERN LOGISTICS INDUSTRY DEVELOPMENT, PROCEEDINGS, 2008, : 16 - 20
  • [43] Addressing lot sizing and warehousing scheduling problem in manufacturing environment
    Mishra, N.
    Kumar, V.
    Kumar, N.
    Kumar, M.
    Tiwari, M. K.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (09) : 11751 - 11762
  • [44] Solution approaches for the integrated production and outbound distribution scheduling problem with multiple plants and perishable items
    Atasagun, Gozde Can
    Karaoglan, Ismail
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 237
  • [45] Profit maximization in simultaneous lot-sizing and scheduling problem
    Sereshti, Narges
    Bijari, Mehdi
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (23) : 9516 - 9523
  • [46] A LINEAR DESCRIPTION OF THE DISCRETE LOT-SIZING AND SCHEDULING PROBLEM
    VANHOESEL, S
    KOLEN, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) : 342 - 353
  • [47] Solving a Production Lot-Sizing and Scheduling Problem from an Enhanced Inventory Management Perspective
    Popovic, Drazen
    Bjelic, Nenad
    Vidovic, Milorad
    Ratkovic, Branislava
    MATHEMATICS, 2023, 11 (09)
  • [48] Optimal Production Scheduling and Lot-sizing In Yoghurt Production Lines
    Kopanos, Georgios M.
    Puigjaner, Luis
    Georgiadis, Michael C.
    20TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2010, 28 : 1153 - 1158
  • [49] Economic Lot-Sizing for Integrated Production and Transportation
    Hwang, Hark-Chin
    OPERATIONS RESEARCH, 2010, 58 (02) : 428 - 444
  • [50] Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems
    Giglio, Davide
    Paolucci, Massimo
    Roshani, Abdolreza
    JOURNAL OF CLEANER PRODUCTION, 2017, 148 : 624 - 641