Solution approaches for the soft drink integrated production lot sizing and scheduling problem

被引:86
|
作者
Ferreira, Deisemara [1 ]
Morabito, Reinaldo [1 ]
Rangel, Socorro [2 ]
机构
[1] Univ Fed Sao Carlos, Dept Prod Engn, BR-13565905 Sao Carlos, SP, Brazil
[2] Sao Paulo State Univ, UNESP, BR-15054000 Sao Jose Do Rio Preto, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
Lot sizing; Scheduling; Soft drink industry; Mixed integer programming; Relax-and-fix heuristic; HEURISTICS; SEARCH;
D O I
10.1016/j.ejor.2008.03.035
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:697 / 706
页数:10
相关论文
共 50 条
  • [31] Tabu Search to Solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem
    Motta Toledo, Claudio Fabiano
    Arantes, Marcio da Silva
    Franca, Paulo Morelato
    GECCO-2011: PROCEEDINGS OF THE 13TH ANNUAL GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2011, : 443 - 448
  • [32] An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints
    Rohaninejad, Mohammad
    Vahedi-Nouri, Behdin
    Hanzalek, Zdenek
    Tavakkoli-Moghaddam, Reza
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (11) : 3994 - 4013
  • [33] Exact solution approaches for bilevel lot-sizing
    Kis, Tamas
    Kovacs, Andras
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 226 (02) : 237 - 245
  • [34] Mathematical Programming for Lot Sizing and Production Scheduling in Foundries
    Duda, J.
    Stawowy, A.
    Basiura, R.
    ARCHIVES OF FOUNDRY ENGINEERING, 2014, 14 (03) : 17 - 20
  • [35] The integrated uncapacitated lot sizing and bin packing problem
    Goulart, Nata
    Noronha, Thiago F.
    Ravetti, Martin G.
    de Souza, Mauricio C.
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (03) : 1197 - 1212
  • [36] The integrated lot-sizing problem of production, remanufacturing and transportation, considering recovery targets
    Luciana Vidal
    Pedro Piñeyro
    Omar Viera
    Journal of Remanufacturing, 2025, 15 (1) : 127 - 149
  • [37] Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system
    Ramezanian, Reza
    Saidi-Mehrabad, Mohammad
    Fattahi, Parviz
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2013, 26 (07) : 681 - 695
  • [38] Developing a matheuristic for dynamic lot sizing and scheduling problem with an application
    Ozbel, Burcu Kubur
    Baykasoglu, Adil
    JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2024, 39 (01): : 401 - 415
  • [39] An optimization approach for the lot sizing and scheduling problem in the brewery industry
    Baldo, Tamara A.
    Santos, Maristela O.
    Almada-Lobo, Bernardo
    Morabito, Reinaldo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 58 - 71
  • [40] An industrial extension of the discrete lot-sizing and scheduling problem
    Jans, R
    Degraeve, Z
    IIE TRANSACTIONS, 2004, 36 (01) : 47 - 58