Solution approaches for the soft drink integrated production lot sizing and scheduling problem

被引:86
|
作者
Ferreira, Deisemara [1 ]
Morabito, Reinaldo [1 ]
Rangel, Socorro [2 ]
机构
[1] Univ Fed Sao Carlos, Dept Prod Engn, BR-13565905 Sao Carlos, SP, Brazil
[2] Sao Paulo State Univ, UNESP, BR-15054000 Sao Jose Do Rio Preto, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
Lot sizing; Scheduling; Soft drink industry; Mixed integer programming; Relax-and-fix heuristic; HEURISTICS; SEARCH;
D O I
10.1016/j.ejor.2008.03.035
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:697 / 706
页数:10
相关论文
共 50 条
  • [21] A note on “The general lot sizing and scheduling problem”
    Ayşe Koçlar
    Haldun Süral
    OR Spectrum, 2005, 27 : 145 - 146
  • [22] Optimization Solution to Lot Sizing and Scheduling Problem in Hybrid Flow-shop
    Song Fugen
    Lei Dayang
    2012 FIFTH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID 2012), VOL 2, 2012, : 231 - 235
  • [23] Economic lot sizing problem with tank scheduling
    Onal, Mehmet
    van den Heuvel, Wilco
    Dereli, Meryem Merve
    Albey, Erinc
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 308 (01) : 166 - 182
  • [24] A reinforcement learning approach for a lot sizing and production scheduling problem with energy consideration
    Jabeur, Mohamed Habib
    Mahjoub, Sonia
    Toublanc, Cyril
    Cariou, Veronique
    IFAC PAPERSONLINE, 2023, 56 (02): : 11141 - +
  • [25] A hybrid BPSO algorithm for Lot Sizing and Scheduling Problem of cold rolling production
    Li, Ticke
    Shi, Cantao
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2007, : 1167 - 1171
  • [26] MIP approaches for a lot sizing and scheduling problem on multiple production lines with scarce resources, temporary workstations, and perishable products
    Soler, Willy A. O.
    Santos, Maristela O.
    Akartunali, Kerem
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2021, 72 (08) : 1691 - 1706
  • [27] An exact optimization approach for an integrated process configuration, lot-sizing, and scheduling problem
    Martinez, Karim Perez
    Adulyasak, Yossiri
    Jans, Raf
    Morabito, Reinaldo
    Vitor Toso, Eli Angela
    COMPUTERS & OPERATIONS RESEARCH, 2019, 103 : 310 - 323
  • [28] Coordinating lot sizing and integrated production and distribution scheduling with batch delivery and holding cost
    Bank, Maedeh
    Mazdeh, Mohammad Mandavi
    Heydari, Mandi
    Teimoury, Ebrahim
    KYBERNETES, 2022, 51 (03) : 1151 - 1179
  • [29] Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches
    Rohaninejad, Mohammad
    Hanzalek, Zdenek
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2023, 263
  • [30] A comparison of solution approaches for the fixed-sequence economic lot scheduling problem
    Bourland, KE
    Yano, CA
    IIE TRANSACTIONS, 1997, 29 (02) : 103 - 108