Stochastic strategic planning of open-pit mines with ore selectivity recourse

被引:4
|
作者
Navarra, A. [1 ]
Montiel, L. [2 ]
Dimitrakopoulos, R. [2 ]
机构
[1] Univ Catolica Norte, Dept Ind Engn, Antofagasta, Chile
[2] McGill Univ, COSMO Stochast Mine Planning Lab, Montreal, PQ, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Strategic mine planning; open-pit; stochastic optimisation; variable neighbourhood descent; SEARCH; OPERATIONS;
D O I
10.1080/17480930.2016.1201380
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Stochastic mine planning algorithms have been extended to better represent ore selection decisions. Under geological uncertainty, existing algorithms generate plans that may violate the mineral processing capacity; under such geological scenarios, the excess ore undergoes a recourse action which is not as profitable as regular processing, hence decreasing the net present value. This decrease has previously been represented as a penalty on excess ore, which may not accurately represent actual operations. The new framework considers the most typical recourse: increasing the cut-off grade into the mineral process. This approach is demonstrated by adapting the VND algorithm of Lamghari et al.
引用
收藏
页码:1 / 17
页数:17
相关论文
共 50 条
  • [21] SPOTLIGHT ON MATERIALS HANDLING IN OPEN-PIT MINES
    ALBERTS, BC
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1984, 84 (01): : 25 - 28
  • [22] Scheduling in iron ore open-pit mining
    Ibrahimov, Maksud
    Mohais, Arvind
    Schellenberg, Sven
    Michalewicz, Zbigniew
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 72 (5-8): : 1021 - 1037
  • [23] Scheduling in iron ore open-pit mining
    Maksud Ibrahimov
    Arvind Mohais
    Sven Schellenberg
    Zbigniew Michalewicz
    The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1021 - 1037
  • [24] Short-term planning of a work shift for open-pit mines: A case study
    Silva-Junior, Ademar L.
    Martins, Aldrin G.
    Pantuza-Jr, Guido
    Cota, Luciano P.
    Souza, Marcone J. F.
    COGENT ENGINEERING, 2023, 10 (01):
  • [25] Capacity planning in open-pit mines under economies of scale and block sequence considerations
    Balci, M.
    Kumral, M.
    MINERAL ECONOMICS, 2025,
  • [26] Geometallurgical Detailing of Plant Operation within Open-Pit Strategic Mine Planning
    Quelopana, Aldo
    ordenes, Javier
    Araya, Rodrigo
    Navarra, Alessandro
    PROCESSES, 2023, 11 (02)
  • [27] IN-PIT CRUSHING - STILL GAINING GROUND IN OPEN-PIT MINES
    WYLLIE, RJM
    E&MJ-ENGINEERING AND MINING JOURNAL, 1987, 188 (06): : 76 - 80
  • [28] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &
  • [29] ON IMPROVING TRUCK SHOVEL PRODUCTIVITY IN OPEN-PIT MINES
    WHITE, JW
    OLSON, JP
    VOHNOUT, SI
    CIM BULLETIN, 1993, 86 (973): : 43 - 49
  • [30] Tracking Production Volumes of Open-Pit Mines with Photogrammetry
    Molnar, Andras
    Domozi, Zsolt
    UKSIM-AMSS 11TH EUROPEAN MODELLING SYMPOSIUM ON COMPUTER MODELLING AND SIMULATION (EMS 2017), 2017, : 100 - 106