Stochastic strategic planning of open-pit mines with ore selectivity recourse

被引:4
|
作者
Navarra, A. [1 ]
Montiel, L. [2 ]
Dimitrakopoulos, R. [2 ]
机构
[1] Univ Catolica Norte, Dept Ind Engn, Antofagasta, Chile
[2] McGill Univ, COSMO Stochast Mine Planning Lab, Montreal, PQ, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Strategic mine planning; open-pit; stochastic optimisation; variable neighbourhood descent; SEARCH; OPERATIONS;
D O I
10.1080/17480930.2016.1201380
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Stochastic mine planning algorithms have been extended to better represent ore selection decisions. Under geological uncertainty, existing algorithms generate plans that may violate the mineral processing capacity; under such geological scenarios, the excess ore undergoes a recourse action which is not as profitable as regular processing, hence decreasing the net present value. This decrease has previously been represented as a penalty on excess ore, which may not accurately represent actual operations. The new framework considers the most typical recourse: increasing the cut-off grade into the mineral process. This approach is demonstrated by adapting the VND algorithm of Lamghari et al.
引用
收藏
页码:1 / 17
页数:17
相关论文
共 50 条
  • [31] ON IMPROVING TRUCK SHOVEL PRODUCTIVITY IN OPEN-PIT MINES
    WHITE, JW
    OLSON, JP
    VOHNOUT, SI
    CIM BULLETIN, 1993, 86 (973): : 43 - 49
  • [32] Cut slope reinforcement technique in open-pit mines
    Gao, YT
    Sun, JB
    Wu, SC
    Jin, AB
    JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2004, 11 (04): : 289 - 292
  • [33] Optimization on Stripping Plan of Outsourced Open-Pit Mines
    Wang Q.
    Zhang Z.-T.
    Gu X.-W.
    Xu X.-C.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2018, 39 (01): : 123 - 127
  • [34] Charging for the waste dumping of open-pit metal mines
    Hou, Yunbing
    Zhang, Zhaoxiang
    Duan, Haifeng
    Xue, Liming
    JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2006, 13 (06): : 481 - 485
  • [35] Determination of the rational production capacity of open-pit mines
    He, Lingchun
    Chen, Wenxiang
    Jinshu Kuangshan/Metal Mine, 2000, (02): : 16 - 18
  • [36] Fuzzy probability for the failure of slope in open-pit mines
    Li, Wenxiu
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 1988, 21 (03): : 81 - 89
  • [37] POWER - A TEMPLATE FOR DISTRIBUTION EFFICIENCY AT OPEN-PIT MINES
    GILLING, J
    E&MJ-ENGINEERING AND MINING JOURNAL, 1991, 192 (06): : Y16 - Y16
  • [38] Image processing for erosion control of open-pit mines
    Khazaeli, Mehdi
    Javadpour, Leili
    Estrada, Hector
    INTERNATIONAL JOURNAL OF ENVIRONMENT AND POLLUTION, 2016, 59 (2-4) : 203 - 212
  • [39] A SOLUTION TO THE PROBLEM OF SCHEDULING AND REPLACEMENT IN OPEN-PIT MINES
    WANG, Q
    SEVIM, H
    DETOMI, G
    21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 662 - 673
  • [40] A Multiagent System for Truck Dispatching in Open-pit Mines
    Icarte, Gabriel
    Berrios, Paulina
    Castillo, Raul
    Herzog, Otthein
    DYNAMICS IN LOGISTICS (LDIC 2020), 2020, : 363 - 373