Short-term planning of a work shift for open-pit mines: A case study

被引:2
|
作者
Silva-Junior, Ademar L. [2 ,3 ,4 ]
Martins, Aldrin G. [5 ,6 ]
Pantuza-Jr, Guido [7 ]
Cota, Luciano P. [1 ,3 ]
Souza, Marcone J. F. [8 ]
机构
[1] Inst Tecnol Vale, BR-354000000 Ouro Preto, MG, Brazil
[2] Univ Fed Ouro Preto, Programa Posgrad Instrumentacao Controle & Automac, BR-35400000 Ouro Preto, Brazil
[3] Inst Tecnol Vale, BR-35400000 Ouro Preto, Brazil
[4] Vale SA, BR-35900900 Itabira, Brazil
[5] Fed Inst Minas Gerais, Dept Min, BR-36415000 Congonhas, MG, Brazil
[6] Themat Network Mat Engn REDEMAT, Grad Program Mat Engn, BR-35000000 Ouro Preto, Brazil
[7] Fed Inst Minas Gerais, BR-35057760 Governador Valadares, Brazil
[8] Univ Fed Ouro Preto, Dept Comp, BR-35400000 Ouro Preto, Brazil
来源
COGENT ENGINEERING | 2023年 / 10卷 / 01期
关键词
Short-term planning; open-pit mining; blending; truck allocation; mixed-integer linear programming; goal programming; MODEL; OPTIMIZATION; ALGORITHM; NETWORKS;
D O I
10.1080/23311916.2023.2168172
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work deals with the short-term planning problem of a work shift for open-pit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and establishing the number of trucks, their routes, and the amount of material transported by them to each discharge point, satisfying a stripping ratio at the desired level. The objectives are to minimize the deviations from the targets for production, chemical grade, and particle size range of each control parameter at each plant and reduce the number of trucks needed for the process. To solve the problem, we developed a mixed-integer linear goal programming model and tested it using real data from an iron ore mine. The results showed that the proposed approach supports decision-makers in the sizing and allocation of truck fleets and in meeting the production and control parameter targets required by the ore processing plants according to the daily scenario, such as low availability of shovels and trucks, flexibility in ore quality, and need for increased production.
引用
收藏
页数:26
相关论文
共 50 条
  • [1] Dynamic shovel allocation approach to short-term production planning in open-pit mines
    Upadhyay, Shiv Prakash
    Askari-Nasab, Hooman
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2019, 33 (01) : 1 - 20
  • [2] Short-term planning for open pit mines: a review
    Blom, Michelle
    Pearce, Adrian R.
    Stuckey, Peter J.
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2019, 33 (05) : 318 - 339
  • [3] New MIP model for short-term planning in open-pit mines considering loading machine performance: a case study in Iran
    Mirzehi M.
    Rezakhah M.
    Mousavi A.
    Nabavi Z.
    International Journal of Mining and Mineral Engineering, 2023, 14 (04) : 341 - 364
  • [4] Mixed integer programming model for short term planning in open-pit mines
    L'Heureux, G.
    Gamache, M.
    Soumis, F.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2013, 122 (02): : 101 - 109
  • [5] Integrated optimization and simulation models for short-term open-pit mine planning
    Torres, V. F. Navarro
    Matens, G. R.
    Martins, A. G.
    Carneiro, W.
    Chaves, L. S.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2020, 120 (11) : 617 - 626
  • [6] Improving productivity at an open-pit mine through enhanced short-term mine planning
    Otto T.J.
    Lindeque G.C.
    Journal of the Southern African Institute of Mining and Metallurgy, 2021, 121 (11) : 589 - 598
  • [7] Designing an advanced RC drilling grid for short-term planning in open pit mines: three case studies
    Ortiz, J. M.
    Magri, E. J.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2014, 114 (08) : 631 - 637
  • [8] Designing an advanced RC drilling grid for short-Term planning in open pit mines: Three case studies
    1600, South African Institute of Mining and Metallurgy (114):
  • [9] Short-term scheduling of an open-pit mine with multiple objectives
    Blom, Michelle
    Pearce, Adrian R.
    Stuckey, Peter J.
    ENGINEERING OPTIMIZATION, 2017, 49 (05) : 777 - 795
  • [10] Regular short-term evaluation of slopes in open pit mines
    Heiss, Christian
    Sammer, Georg
    Geomechanik und Tunnelbau, 2024, 17 (05): : 389 - 394