Short-term planning of a work shift for open-pit mines: A case study

被引:2
|
作者
Silva-Junior, Ademar L. [2 ,3 ,4 ]
Martins, Aldrin G. [5 ,6 ]
Pantuza-Jr, Guido [7 ]
Cota, Luciano P. [1 ,3 ]
Souza, Marcone J. F. [8 ]
机构
[1] Inst Tecnol Vale, BR-354000000 Ouro Preto, MG, Brazil
[2] Univ Fed Ouro Preto, Programa Posgrad Instrumentacao Controle & Automac, BR-35400000 Ouro Preto, Brazil
[3] Inst Tecnol Vale, BR-35400000 Ouro Preto, Brazil
[4] Vale SA, BR-35900900 Itabira, Brazil
[5] Fed Inst Minas Gerais, Dept Min, BR-36415000 Congonhas, MG, Brazil
[6] Themat Network Mat Engn REDEMAT, Grad Program Mat Engn, BR-35000000 Ouro Preto, Brazil
[7] Fed Inst Minas Gerais, BR-35057760 Governador Valadares, Brazil
[8] Univ Fed Ouro Preto, Dept Comp, BR-35400000 Ouro Preto, Brazil
来源
COGENT ENGINEERING | 2023年 / 10卷 / 01期
关键词
Short-term planning; open-pit mining; blending; truck allocation; mixed-integer linear programming; goal programming; MODEL; OPTIMIZATION; ALGORITHM; NETWORKS;
D O I
10.1080/23311916.2023.2168172
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work deals with the short-term planning problem of a work shift for open-pit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and establishing the number of trucks, their routes, and the amount of material transported by them to each discharge point, satisfying a stripping ratio at the desired level. The objectives are to minimize the deviations from the targets for production, chemical grade, and particle size range of each control parameter at each plant and reduce the number of trucks needed for the process. To solve the problem, we developed a mixed-integer linear goal programming model and tested it using real data from an iron ore mine. The results showed that the proposed approach supports decision-makers in the sizing and allocation of truck fleets and in meeting the production and control parameter targets required by the ore processing plants according to the daily scenario, such as low availability of shovels and trucks, flexibility in ore quality, and need for increased production.
引用
收藏
页数:26
相关论文
共 50 条
  • [31] Research on path planning methods for autonomous dump trucks in open-pit mines
    Huang, Jiade
    Liu, Yong
    Deng, Mukun
    Mei, Wenqing
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (08): : 182 - 191
  • [32] OPEN-PIT DEWATERING AT PINE POINT MINES
    CALVER, B
    FARNSWOR.DJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (692): : 1290 - &
  • [33] CHANGING MANAGEMENT METHODS IN OPEN-PIT MINES
    YOUNG, PV
    CIM BULLETIN, 1985, 78 (879): : 46 - 48
  • [34] Slope instabilities in Polish open-pit mines
    Bednarczyk, Z.
    LANDSLIDES AND ENGINEERED SLOPES: EXPERIENCE, THEORY AND PRACTICE, VOLS 1-3, 2016, : 371 - 379
  • [35] The effect of blasting on environment in the open-pit mines
    Oddzialywanie robót strzalowych na s´rodowisko odkrywkowych zakladów górniczych
    1600, Wydawnictwo Politechniki Wroclawskiej, Wybrzeze Wyspianskiego 27, Wroclaw, 50-370, Poland
  • [36] SPOTLIGHT ON MATERIALS HANDLING IN OPEN-PIT MINES
    ALBERTS, BC
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1984, 84 (01): : 25 - 28
  • [37] Potential triggers for large earthquakes in open-pit mines: A case study from Kuzbass, Siberia
    Kocharyan, Gevorg
    Qi, Chengzhi
    Kishkina, Svetlana
    Kulikov, Vladimir
    DEEP UNDERGROUND SCIENCE AND ENGINEERING, 2022, 1 (02) : 101 - 115
  • [38] An Empirical Study of Propagation Models for Wireless Communications in Open-pit Mines
    Almeida, Erika P. L.
    Caldwel, George
    Rodriguez, Ignacio
    Vieira, Robson D.
    Sorensen, Troels B.
    Mogensen, Preben
    Uzeda Garcia, Luis G.
    2018 IEEE 87TH VEHICULAR TECHNOLOGY CONFERENCE (VTC SPRING), 2018,
  • [39] Potential triggers for large earthquakes in open-pit mines:A case study from Kuzbass, Siberia
    Gevorg Kocharyan
    Chengzhi Qi
    Svetlana Kishkina
    Vladimir Kulikov
    DeepUndergroundScienceandEngineering, 2022, 1 (02) : 101 - 115
  • [40] Capacity planning in open-pit mines under economies of scale and block sequence considerations
    Balci, M.
    Kumral, M.
    MINERAL ECONOMICS, 2025,