Short-term planning of a work shift for open-pit mines: A case study

被引:2
|
作者
Silva-Junior, Ademar L. [2 ,3 ,4 ]
Martins, Aldrin G. [5 ,6 ]
Pantuza-Jr, Guido [7 ]
Cota, Luciano P. [1 ,3 ]
Souza, Marcone J. F. [8 ]
机构
[1] Inst Tecnol Vale, BR-354000000 Ouro Preto, MG, Brazil
[2] Univ Fed Ouro Preto, Programa Posgrad Instrumentacao Controle & Automac, BR-35400000 Ouro Preto, Brazil
[3] Inst Tecnol Vale, BR-35400000 Ouro Preto, Brazil
[4] Vale SA, BR-35900900 Itabira, Brazil
[5] Fed Inst Minas Gerais, Dept Min, BR-36415000 Congonhas, MG, Brazil
[6] Themat Network Mat Engn REDEMAT, Grad Program Mat Engn, BR-35000000 Ouro Preto, Brazil
[7] Fed Inst Minas Gerais, BR-35057760 Governador Valadares, Brazil
[8] Univ Fed Ouro Preto, Dept Comp, BR-35400000 Ouro Preto, Brazil
来源
COGENT ENGINEERING | 2023年 / 10卷 / 01期
关键词
Short-term planning; open-pit mining; blending; truck allocation; mixed-integer linear programming; goal programming; MODEL; OPTIMIZATION; ALGORITHM; NETWORKS;
D O I
10.1080/23311916.2023.2168172
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work deals with the short-term planning problem of a work shift for open-pit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and establishing the number of trucks, their routes, and the amount of material transported by them to each discharge point, satisfying a stripping ratio at the desired level. The objectives are to minimize the deviations from the targets for production, chemical grade, and particle size range of each control parameter at each plant and reduce the number of trucks needed for the process. To solve the problem, we developed a mixed-integer linear goal programming model and tested it using real data from an iron ore mine. The results showed that the proposed approach supports decision-makers in the sizing and allocation of truck fleets and in meeting the production and control parameter targets required by the ore processing plants according to the daily scenario, such as low availability of shovels and trucks, flexibility in ore quality, and need for increased production.
引用
收藏
页数:26
相关论文
共 50 条
  • [21] Inter-ramp and bench design of open-pit mines: the Portage pit case study
    Grenon, Martin
    Laflamme, Amelie-Julie
    CANADIAN GEOTECHNICAL JOURNAL, 2011, 48 (11) : 1601 - 1615
  • [22] BREEZE CIRCULATION IN OPEN-PIT MINES
    BELOUSOV, VI
    JOURNAL OF MINING SCIENCE, 1995, 31 (03) : 216 - 220
  • [23] Breeze Circulation in Open-Pit Mines
    J Min Sci, (216):
  • [24] Stochastic strategic planning of open-pit mines with ore selectivity recourse
    Navarra, A.
    Montiel, L.
    Dimitrakopoulos, R.
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2018, 32 (01) : 1 - 17
  • [25] OPTIMUM DESIGN OF OPEN-PIT MINES
    LERCHS, H
    GROSSMAN.FI
    OPERATIONS RESEARCH, 1964, 12 : B59 - &
  • [26] Study on Complexity Planning Model of Pumped Storage in Abandoned Open-Pit Mine: A Case Study of Fushun Open-Pit Mine
    Luo, Pingjia
    Han, Xueqi
    Chen, Ning
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [27] Production scheduling of open-pit mines using genetic algorithm: a case study
    Alipour, Aref
    Khodaiari, Ali Asghar
    Jafari, Ahmad
    Tavakkoli-Moghaddam, Reza
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2020, 15 (03) : 176 - 183
  • [28] Study on the performance of a composite dust suppressant in open-pit mines
    Yu, Rongxia
    Huang, Zhian
    Zeng, Mengyang
    Li, Wei
    Liu, Qianming
    Ding, Hao
    Ren, Jiaze
    Li, Jinyang
    Chang, Jinlu
    Yang, Yongrui
    ATMOSPHERIC POLLUTION RESEARCH, 2025, 16 (02)
  • [29] HYBRID REASONING FOR MULTI-ROBOT DRILL PLANNING IN OPEN-PIT MINES
    Mansouri, Masoumeh
    Andreasson, Henrik
    Pecora, Federico
    ACTA POLYTECHNICA, 2016, 56 (01) : 47 - 56
  • [30] Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines
    Xu, Changyou
    Chen, Gang
    Lu, Huabo
    Zhang, Qiuxia
    Liu, Zhengke
    Bian, Jing
    MATHEMATICS, 2024, 12 (13)