Short-term planning of a work shift for open-pit mines: A case study

被引:2
|
作者
Silva-Junior, Ademar L. [2 ,3 ,4 ]
Martins, Aldrin G. [5 ,6 ]
Pantuza-Jr, Guido [7 ]
Cota, Luciano P. [1 ,3 ]
Souza, Marcone J. F. [8 ]
机构
[1] Inst Tecnol Vale, BR-354000000 Ouro Preto, MG, Brazil
[2] Univ Fed Ouro Preto, Programa Posgrad Instrumentacao Controle & Automac, BR-35400000 Ouro Preto, Brazil
[3] Inst Tecnol Vale, BR-35400000 Ouro Preto, Brazil
[4] Vale SA, BR-35900900 Itabira, Brazil
[5] Fed Inst Minas Gerais, Dept Min, BR-36415000 Congonhas, MG, Brazil
[6] Themat Network Mat Engn REDEMAT, Grad Program Mat Engn, BR-35000000 Ouro Preto, Brazil
[7] Fed Inst Minas Gerais, BR-35057760 Governador Valadares, Brazil
[8] Univ Fed Ouro Preto, Dept Comp, BR-35400000 Ouro Preto, Brazil
来源
COGENT ENGINEERING | 2023年 / 10卷 / 01期
关键词
Short-term planning; open-pit mining; blending; truck allocation; mixed-integer linear programming; goal programming; MODEL; OPTIMIZATION; ALGORITHM; NETWORKS;
D O I
10.1080/23311916.2023.2168172
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work deals with the short-term planning problem of a work shift for open-pit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and establishing the number of trucks, their routes, and the amount of material transported by them to each discharge point, satisfying a stripping ratio at the desired level. The objectives are to minimize the deviations from the targets for production, chemical grade, and particle size range of each control parameter at each plant and reduce the number of trucks needed for the process. To solve the problem, we developed a mixed-integer linear goal programming model and tested it using real data from an iron ore mine. The results showed that the proposed approach supports decision-makers in the sizing and allocation of truck fleets and in meeting the production and control parameter targets required by the ore processing plants according to the daily scenario, such as low availability of shovels and trucks, flexibility in ore quality, and need for increased production.
引用
收藏
页数:26
相关论文
共 50 条
  • [41] IN-PIT CRUSHING - STILL GAINING GROUND IN OPEN-PIT MINES
    WYLLIE, RJM
    E&MJ-ENGINEERING AND MINING JOURNAL, 1987, 188 (06): : 76 - 80
  • [42] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &
  • [43] ON IMPROVING TRUCK SHOVEL PRODUCTIVITY IN OPEN-PIT MINES
    WHITE, JW
    OLSON, JP
    VOHNOUT, SI
    CIM BULLETIN, 1993, 86 (973): : 43 - 49
  • [44] Tracking Production Volumes of Open-Pit Mines with Photogrammetry
    Molnar, Andras
    Domozi, Zsolt
    UKSIM-AMSS 11TH EUROPEAN MODELLING SYMPOSIUM ON COMPUTER MODELLING AND SIMULATION (EMS 2017), 2017, : 100 - 106
  • [45] Chemical Technology of Dust Suppression on Open-Pit Mines
    Kovshov, S.
    Kovshov, V.
    INTERNATIONAL JOURNAL OF ECOLOGY & DEVELOPMENT, 2015, 30 (03) : 55 - 67
  • [46] Cut slope reinforcement technique in open-pit mines
    Gao, YT
    Sun, JB
    Wu, SC
    Jin, AB
    JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2004, 11 (04): : 289 - 292
  • [47] Optimization on Stripping Plan of Outsourced Open-Pit Mines
    Wang Q.
    Zhang Z.-T.
    Gu X.-W.
    Xu X.-C.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2018, 39 (01): : 123 - 127
  • [48] Determination of the rational production capacity of open-pit mines
    He, Lingchun
    Chen, Wenxiang
    Jinshu Kuangshan/Metal Mine, 2000, (02): : 16 - 18
  • [49] Charging for the waste dumping of open-pit metal mines
    Hou, Yunbing
    Zhang, Zhaoxiang
    Duan, Haifeng
    Xue, Liming
    JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING, 2006, 13 (06): : 481 - 485
  • [50] POWER - A TEMPLATE FOR DISTRIBUTION EFFICIENCY AT OPEN-PIT MINES
    GILLING, J