Real-Time Scheduling of Single-Arm Cluster Tools Subject to Residency Time Constraints and Bounded Activity Time Variation

被引:83
|
作者
Qiao, Yan [1 ]
Wu, NaiQi [1 ]
Zhou, MengChu [2 ,3 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Dept Ind Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] Tongji Univ, Minist Educ, Key Lab Embedded Syst & Serv Comp, Shanghai 200092, Peoples R China
[3] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
基金
中国国家自然科学基金;
关键词
Cluster tools; discrete event system; Petri net (PN); scheduling; semiconductor manufacturing; STEADY-STATE THROUGHPUT; PETRI NETS; MANUFACTURING SYSTEMS; MULTICLUSTER TOOLS; EVENT GRAPH; SCHEDULABILITY; PERFORMANCE; OPERATION; DEADLOCK; DESIGN;
D O I
10.1109/TASE.2012.2192476
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
It is very challenging to schedule cluster tools subject to wafer residency time constraints and activity time variation. This work develops a Petri net model to describe the system and proposes a two-level real-time scheduling architecture. At the lower level, a real-time control policy is used to offset the activity time variation as much as possible. At the upper level, a periodical off-line schedule is derived under the normal condition. This work presents the schedulability conditions and scheduling algorithms for an off-line schedule. The schedulability conditions can be analytically checked. If they are satisfied, an off-line schedule can be analytically found. The off-line schedule together with a real-time control policy forms the real-time schedule for the system. It is optimal in terms of cycle time minimization. Illustrative examples are given to show the application of the proposed approach.
引用
收藏
页码:564 / 577
页数:14
相关论文
共 50 条
  • [41] Scheduling Transient Processes for Time-Constrained Single-Arm Robotic Multi-Cluster Tools
    Zhu, QingHua
    Zhou, MengChu
    Qiao, Yan
    Wu, Naiqi
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2017, 30 (03) : 261 - 269
  • [42] Petri net-based scheduling of time constrained single-arm cluster tools with wafer revisiting
    Liu, ZiCheng
    Wu, NaiQi
    Yang, FaJun
    ADVANCES IN MECHANICAL ENGINEERING, 2016, 8 (05) : 1 - 13
  • [43] Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints
    Zhou Bing-hai
    Gao Zhong-shun
    Chen Jia
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (01) : 160 - 166
  • [44] Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints
    周炳海
    高忠顺
    陈佳
    Journal of Central South University, 2014, 21 (01) : 160 - 166
  • [45] Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints
    Bing-hai Zhou
    Zhong-shun Gao
    Jia Chen
    Journal of Central South University, 2014, 21 : 160 - 166
  • [46] Scheduling Single-Blade Cluster Tools with Time Window Constraints
    Li, Linying
    Hu, Jingtao
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1069 - 1072
  • [47] Robot Waiting Time Analysis and Its Impact on Wafer Delay Time of Single-Arm Cluster Tools
    Xiong, WenQing
    Qiao, Yan
    Wu, NaiQi
    Bai, LiPing
    Chen, MingXin
    Hsieh, PinHui
    Yin, Li
    IFAC PAPERSONLINE, 2020, 53 (04): : 384 - 389
  • [48] Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constraints via Petri Net Model
    Gu, Lei
    Wu, Naiqi
    Li, Tan
    Zhang, Siwei
    Wu, Wenyu
    MATHEMATICS, 2024, 12 (18)
  • [49] Modeling, Analysis and Control of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation Based on Petri Nets
    Wu, Nai Qi
    Zhou, MengChu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (02) : 446 - 454
  • [50] Scheduling method for single-arm cluster tools of wafer fabrications with residency and continuous reentrancy
    Zhou, Binghai
    Wang, Zhu
    Chen, Jia
    Journal of Southeast University (English Edition), 2013, 29 (02) : 187 - 193