Real-Time Scheduling of Single-Arm Cluster Tools Subject to Residency Time Constraints and Bounded Activity Time Variation

被引:83
|
作者
Qiao, Yan [1 ]
Wu, NaiQi [1 ]
Zhou, MengChu [2 ,3 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Dept Ind Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] Tongji Univ, Minist Educ, Key Lab Embedded Syst & Serv Comp, Shanghai 200092, Peoples R China
[3] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
基金
中国国家自然科学基金;
关键词
Cluster tools; discrete event system; Petri net (PN); scheduling; semiconductor manufacturing; STEADY-STATE THROUGHPUT; PETRI NETS; MANUFACTURING SYSTEMS; MULTICLUSTER TOOLS; EVENT GRAPH; SCHEDULABILITY; PERFORMANCE; OPERATION; DEADLOCK; DESIGN;
D O I
10.1109/TASE.2012.2192476
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
It is very challenging to schedule cluster tools subject to wafer residency time constraints and activity time variation. This work develops a Petri net model to describe the system and proposes a two-level real-time scheduling architecture. At the lower level, a real-time control policy is used to offset the activity time variation as much as possible. At the upper level, a periodical off-line schedule is derived under the normal condition. This work presents the schedulability conditions and scheduling algorithms for an off-line schedule. The schedulability conditions can be analytically checked. If they are satisfied, an off-line schedule can be analytically found. The off-line schedule together with a real-time control policy forms the real-time schedule for the system. It is optimal in terms of cycle time minimization. Illustrative examples are given to show the application of the proposed approach.
引用
收藏
页码:564 / 577
页数:14
相关论文
共 50 条
  • [21] Virtual Cell-Based Scheduling Approach to Single-Robotic-Arm Cluster Tools Subject to Wafer Residency Time Constraints
    Wang, Jufeng
    Liu, Chunfeng
    Zhou, MengChu
    Abusorrah, Abdullah
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2025, 22 : 240 - 251
  • [22] Virtual Cell-Based Scheduling Approach to Single-Robotic-Arm Cluster Tools Subject to Wafer Residency Time Constraints
    Wang, Jufeng
    Liu, Chunfeng
    Zhou, MengChu
    Abusorrah, Abdullah
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2025, 22 : 240 - 251
  • [23] Modeling and schedulability analysis of single-arm cluster tools with wafer residency time constraints using Petri net
    Wu, Naiqi
    Chu, Chengbin
    Chu, Feng
    Zhou, MengChu
    PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL, VOLS 1 AND 2, 2008, : 84 - +
  • [24] Cyclic Scheduling Analysis of Single-arm Cluster Tools with Wafer Residency Time Constraint and Chamber Cleaning Operations
    Yang, FaJun
    Wu, NaiQi
    Su, Rong
    Qiao, Yan
    2018 IEEE 14TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2018, : 241 - 246
  • [25] Petri Net Modeling and Real-Time Control of Dual-Arm Cluster Tools with Residency Time Constraint and Activity Time Variations
    Wu, NaiQi
    Zhou, MengChu
    Peng, ShihSen
    Chu, Feng
    Chu, Chengbin
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2008, : 109 - +
  • [26] Analysis of Wafer Sojourn Time in Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation
    Wu, NaiQi
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2010, 23 (01) : 53 - 64
  • [27] Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
    Wang, Jipeng
    Hu, Hesuan
    Pan, Chunrong
    Zhou, Yuan
    Li, Liang
    IEEE-CAA JOURNAL OF AUTOMATICA SINICA, 2020, 7 (03) : 776 - 789
  • [28] Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints
    Jipeng Wang
    Hesuan Hu
    Chunrong Pan
    Yuan Zhou
    Liang Li
    IEEE/CAAJournalofAutomaticaSinica, 2020, 7 (03) : 776 - 789
  • [29] Efficient Approach to Cyclic Scheduling of Single-Arm Cluster Tools With Chamber Cleaning Operations and Wafer Residency Time Constraint
    Yang, Fajun
    Wu, Naiqi
    Gao, Kaizhou
    Zhang, Chunjiang
    Zhu, Yuting
    Su, Rong
    Qiao, Yan
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2018, 31 (02) : 196 - 205
  • [30] Scheduling of Single-Arm Multi-Cluster Tools to Achieve the Minimum Cycle Time
    Zhu, QingHua
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    2013 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), 2013, : 3555 - 3560