Construction Safety Risk Assessment and Early Warning of Nearshore Tunnel Based on BIM Technology

被引:4
|
作者
Wu, Ping [1 ]
Yang, Linxi [1 ,2 ]
Li, Wangxin [1 ,3 ]
Huang, Jiamin [1 ,2 ]
Xu, Yidong [1 ]
机构
[1] NingboTech Univ, Sch Civil Engn & Architecture, Ningbo 315100, Peoples R China
[2] Chongqing Jiaotong Univ, Sch Civil Engn, Chongqing 400074, Peoples R China
[3] Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China
关键词
nearshore tunnel; building information modeling technology; DS theory of evidence law; construction safety risk assessment; risk warning; ARTIFICIAL-INTELLIGENCE; MANAGEMENT; SYSTEM; FRAMEWORK; CHINA; SUPPORT; MODEL;
D O I
10.3390/jmse11101996
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The challenging nature of nearshore tunnel construction environments introduces a multitude of potential hazards, consequently escalating the likelihood of incidents such as water influx. Existing construction safety risk management methodologies often depend on subjective experiences, leading to inconsistent reliability in assessment outcomes. The multifaceted nature of construction safety risk factors, their sources, and structures complicate the validation of these assessments, thus compromising their precision. Moreover, risk assessments generally occur pre-construction, leaving on-site personnel incapable of recommending pragmatic mitigation strategies based on real-time safety issues. To address these concerns, this paper introduces a construction safety risk assessment approach for nearshore tunnels based on multi-data fusion. In addressing the issue of temporal effectiveness when the conflict factor K in traditional Dempster-Shafer (DS) evidence theory nears infinity, the confidence Hellinger distance is incorporated for improvement. This is designed to accurately demonstrate the degree of conflict between two evidence chains. Subsequently, an integrated evaluation of construction safety risks for a specific nearshore tunnel in Ningbo is conducted through the calculation of similarity, support degree, and weight factors. Simultaneously, the Revit secondary development technology is utilized to visualize risk monitoring point warnings. The evaluation concludes that monitoring point K7+860 exhibits a level II risk, whereas other monitoring points maintain a normal status.
引用
收藏
页数:26
相关论文
共 50 条
  • [1] Research on Early Warning and Risk Control Technology in Karst Tunnel Construction
    Liu, Qin
    Li, Shucai
    Zhang, Ning
    Xue, Yiguo
    Yang, Lei
    Zhang, Xiao
    Liu, Rentai
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 253 - 256
  • [2] Research on BIM-Based Visualization, Simulation, and Early Warning System for Shield Tunnel Construction
    Cheng, Qian
    Wang, Xiangyu
    Sun, Junbo
    Zhao, Hongyu
    Liu, Xianda
    BUILDINGS, 2025, 15 (05)
  • [3] Study on BIM-based construction project cost and schedule risk early warning
    Sun, Chengshuang
    Man, Qingpeng
    Wang, Yaowu
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (02) : 469 - 477
  • [4] A digital twin approach for tunnel construction safety early warning and management
    Ye, Zijian
    Ye, Ying
    Zhang, Chengping
    Zhang, Zhiming
    Li, Wei
    Wang, Xuejie
    Wang, Lei
    Wang, Libin
    COMPUTERS IN INDUSTRY, 2023, 144
  • [5] Construction safety assessment of high-piled wharf based on BIM technology
    Mou, Wensong
    Xie, Kaiyun
    Wu, Shuangfei
    Yuan, Yuan
    INTERNATIONAL CONFERENCE ON SMART TRANSPORTATION AND CITY ENGINEERING 2021, 2021, 12050
  • [6] Developing a cloud evidence method for dynamic early warning of tunnel construction safety risk in undersea environment
    Zhou, Hong
    Gao, Binwei
    Zhao, Xianbo
    Peng, Linyu
    Bai, Shichao
    DEVELOPMENTS IN THE BUILT ENVIRONMENT, 2023, 16
  • [7] Building engineering safety risk assessment and early warning mechanism construction based on distributed machine learning algorithm
    Liu, Hongmei
    Tian, Guiliang
    SAFETY SCIENCE, 2019, 120 : 764 - 771
  • [8] Research on Visual Management Technology of Tunnel Construction Process Based on BIM Technology
    Zhou, Yue
    Wang, Chuang
    Yuan, Bingxiang
    Chen, Minjie
    Lv, Jianbing
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [9] Pedestrian Risk Assessment and Early Warning Algorithm Based on Psychological Safety Distance
    Yuan Q.
    Yan N.-F.
    Hao W.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2022, 35 (01): : 109 - 118
  • [10] Safety Risk Management of Prefabricated Building Construction Based on Ontology Technology in the BIM Environment
    Shen, Ye
    Xu, Min
    Lin, Yini
    Cui, Caiyun
    Shi, Xiaobo
    Liu, Yong
    BUILDINGS, 2022, 12 (06)