Research on BIM-Based Visualization, Simulation, and Early Warning System for Shield Tunnel Construction

被引:0
|
作者
Cheng, Qian [1 ]
Wang, Xiangyu [2 ]
Sun, Junbo [3 ]
Zhao, Hongyu [1 ]
Liu, Xianda [2 ]
机构
[1] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
[2] East China Jiao Tong Univ, Sch Civil Engn & Architecture, Nanchang 330013, Peoples R China
[3] Curtin Univ, Sch Design & Built Environm, Perth, WA 6102, Australia
关键词
early warning simulation system; BIM; visual programming; shield construction; finite element analysis; dynamo;
D O I
10.3390/buildings15050746
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study aims to facilitate a comparison between construction monitoring data and simulation results, focusing on the dynamic adjustment of safety monitoring parameters in shield construction. First, a finite element simulation was performed to define a reasonable range for shield parameters based on settlement control values, thereby determining the theoretical settlement value. An early warning system was then developed integrating two key factors: theoretical and control settlement values. Finally, Dynamo was used to merge the digital and analog data, enhancing the visual representation of the monitoring information. The findings show that combining simulations with an early warning system effectively addresses the dynamic control challenges of shield construction parameters. Furthermore, integrating digital and analog monitoring significantly improves the efficiency of real-time visualization in monitoring data. This research provides a novel and effective methodology for enhancing shield tunnel construction safety, precision, and efficiency, offering critical insights for large-scale infrastructure projects and contributing to more reliable monitoring systems in complex construction environments.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] A BIM-based visualization and warning system for fire rescue
    Chen, Xiu-Shan
    Liu, Chi-Chang
    Wu, I-Chen
    ADVANCED ENGINEERING INFORMATICS, 2018, 37 : 42 - 53
  • [2] BIM-BASED RISK IDENTIFICATION SYSTEM IN TUNNEL CONSTRUCTION
    Zhang, Limao
    Wu, Xianguo
    Ding, Lieyun
    Skibniewski, Miroslaw J.
    Lu, Yujie
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (04) : 529 - 539
  • [3] BIM-Based Visualization Research in the Construction Industry: A Network Analysis
    Wu, Zezhou
    Chen, Changhong
    Cai, Yuzhu
    Lu, Chen
    Wang, Hao
    Yu, Tao
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (18)
  • [4] Study on BIM-based construction project cost and schedule risk early warning
    Sun, Chengshuang
    Man, Qingpeng
    Wang, Yaowu
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 29 (02) : 469 - 477
  • [5] A BIM-based construction claim management model for early identification and visualization of claims
    Jalal, Majid Parchami
    Roushan, Tayebe Yavari
    Noorzai, Esmatullah
    Alizadeh, Maryam
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2021, 10 (02) : 227 - 257
  • [6] Research on BIM-Based highway tunnel design, construction and maintenance management platform
    Chen, Lijuan
    Lu, Shiyu
    Zhao, Qianyu
    2018 INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURE AND DISASTER PREVENTION, 2019, 218
  • [7] BIM-based digital platform and risk management system for mountain tunnel construction
    Naifei Liu
    Desai Guo
    Zhanping Song
    Shiming Zhong
    Ruoqi Hu
    Scientific Reports, 13
  • [8] BIM-based digital platform and risk management system for mountain tunnel construction
    Liu, Naifei
    Guo, Desai
    Song, Zhanping
    Zhong, Shiming
    Hu, Ruoqi
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [9] Development of a BIM-based automated construction system
    Ding, Lieyun
    Wei, Ran
    Che, Haichao
    CREATIVE CONSTRUCTION CONFERENCE 2014, 2014, 85 : 123 - 131
  • [10] Preliminary study for performance analysis of BIM-based building construction simulation system
    Seok-heon Yun
    Ki-hyun Jun
    Chang-baek Son
    Sang-chul Kim
    KSCE Journal of Civil Engineering, 2014, 18 : 531 - 540