Construction Safety Risk Assessment and Early Warning of Nearshore Tunnel Based on BIM Technology

被引:4
|
作者
Wu, Ping [1 ]
Yang, Linxi [1 ,2 ]
Li, Wangxin [1 ,3 ]
Huang, Jiamin [1 ,2 ]
Xu, Yidong [1 ]
机构
[1] NingboTech Univ, Sch Civil Engn & Architecture, Ningbo 315100, Peoples R China
[2] Chongqing Jiaotong Univ, Sch Civil Engn, Chongqing 400074, Peoples R China
[3] Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China
关键词
nearshore tunnel; building information modeling technology; DS theory of evidence law; construction safety risk assessment; risk warning; ARTIFICIAL-INTELLIGENCE; MANAGEMENT; SYSTEM; FRAMEWORK; CHINA; SUPPORT; MODEL;
D O I
10.3390/jmse11101996
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The challenging nature of nearshore tunnel construction environments introduces a multitude of potential hazards, consequently escalating the likelihood of incidents such as water influx. Existing construction safety risk management methodologies often depend on subjective experiences, leading to inconsistent reliability in assessment outcomes. The multifaceted nature of construction safety risk factors, their sources, and structures complicate the validation of these assessments, thus compromising their precision. Moreover, risk assessments generally occur pre-construction, leaving on-site personnel incapable of recommending pragmatic mitigation strategies based on real-time safety issues. To address these concerns, this paper introduces a construction safety risk assessment approach for nearshore tunnels based on multi-data fusion. In addressing the issue of temporal effectiveness when the conflict factor K in traditional Dempster-Shafer (DS) evidence theory nears infinity, the confidence Hellinger distance is incorporated for improvement. This is designed to accurately demonstrate the degree of conflict between two evidence chains. Subsequently, an integrated evaluation of construction safety risks for a specific nearshore tunnel in Ningbo is conducted through the calculation of similarity, support degree, and weight factors. Simultaneously, the Revit secondary development technology is utilized to visualize risk monitoring point warnings. The evaluation concludes that monitoring point K7+860 exhibits a level II risk, whereas other monitoring points maintain a normal status.
引用
收藏
页数:26
相关论文
共 50 条
  • [41] Research on the Key Technology of Electric Power Safety Production Assessment and Early Warning
    Wu, Yun
    Shu, Haojie
    Bao, Lishan
    Xu, Guannan
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ELECTRONIC, MECHANICAL, INFORMATION AND MANAGEMENT SOCIETY (EMIM), 2016, 40 : 1489 - 1493
  • [42] Automatic safety risk assessment method of subway construction based on BIM- improved LEC method
    Ying, Lu
    Guochen, Wu
    Yunxuan, Deng
    Zhipeng, Zhou
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2022, 55 : 129 - 138
  • [43] An integrated system for tunnel construction safety control based on BIM-IoT-PSO
    Jiang, Hongren
    Jiang, Annan
    JOURNAL OF CIVIL STRUCTURAL HEALTH MONITORING, 2024, 14 (02) : 269 - 284
  • [44] Study on Early Warning Mechanism on Water Inrush Hazards in Construction of High Risk Subsea Tunnel
    Xue, Yi-Guo
    Li, Shu-Cai
    Su, Mao-Xin
    Li, Wei-Teng
    Zhao, Yan
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 360 - 364
  • [45] Application of BIM Virtual Technology in Highway Tunnel Construction Management
    Qu, Wanbo
    FORTHCOMING NETWORKS AND SUSTAINABILITY IN THE IOT ERA (FONES-IOT 2021), VOL 1, 2022, 129 : 205 - 212
  • [46] Application of BIM in construction management of railway tunnel by virtual technology
    Chen Fuqiang
    2018 2ND INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2018), 2018, 153
  • [47] Safety Risk Early-Warning for Metro Construction Based on Factor Analysis and BP_Adaboost Network
    Wang, Hong-De
    Ma, Bai-Le
    Zhang, Yan-Chao
    FUZZY SYSTEMS AND DATA MINING II, 2016, 293 : 341 - 346
  • [48] Multi-Information Fusion Based on BIM and Intuitionistic Fuzzy D-S Evidence Theory for Safety Risk Assessment of Undersea Tunnel Construction Projects
    Xun, Xiaolin
    Zhang, Jun
    Yuan, Yongbo
    BUILDINGS, 2022, 12 (11)
  • [49] Construction safety risk drivers: A BIM approach
    Malekitabar, Hassan
    Ardeshir, Abdollah
    Sebt, Mohammad Hassan
    Stouffs, Rudi
    SAFETY SCIENCE, 2016, 82 : 445 - 455
  • [50] Risk Assessment of Tunnel Construction Based on Improved Cloud Model
    Lin, C. J.
    Zhang, M.
    Li, L. P.
    Zhou, Z. Q.
    Liu, S.
    Liu, C.
    Li, T.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (03)