Construction Safety Risk Assessment and Early Warning of Nearshore Tunnel Based on BIM Technology

被引:4
|
作者
Wu, Ping [1 ]
Yang, Linxi [1 ,2 ]
Li, Wangxin [1 ,3 ]
Huang, Jiamin [1 ,2 ]
Xu, Yidong [1 ]
机构
[1] NingboTech Univ, Sch Civil Engn & Architecture, Ningbo 315100, Peoples R China
[2] Chongqing Jiaotong Univ, Sch Civil Engn, Chongqing 400074, Peoples R China
[3] Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China
关键词
nearshore tunnel; building information modeling technology; DS theory of evidence law; construction safety risk assessment; risk warning; ARTIFICIAL-INTELLIGENCE; MANAGEMENT; SYSTEM; FRAMEWORK; CHINA; SUPPORT; MODEL;
D O I
10.3390/jmse11101996
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The challenging nature of nearshore tunnel construction environments introduces a multitude of potential hazards, consequently escalating the likelihood of incidents such as water influx. Existing construction safety risk management methodologies often depend on subjective experiences, leading to inconsistent reliability in assessment outcomes. The multifaceted nature of construction safety risk factors, their sources, and structures complicate the validation of these assessments, thus compromising their precision. Moreover, risk assessments generally occur pre-construction, leaving on-site personnel incapable of recommending pragmatic mitigation strategies based on real-time safety issues. To address these concerns, this paper introduces a construction safety risk assessment approach for nearshore tunnels based on multi-data fusion. In addressing the issue of temporal effectiveness when the conflict factor K in traditional Dempster-Shafer (DS) evidence theory nears infinity, the confidence Hellinger distance is incorporated for improvement. This is designed to accurately demonstrate the degree of conflict between two evidence chains. Subsequently, an integrated evaluation of construction safety risks for a specific nearshore tunnel in Ningbo is conducted through the calculation of similarity, support degree, and weight factors. Simultaneously, the Revit secondary development technology is utilized to visualize risk monitoring point warnings. The evaluation concludes that monitoring point K7+860 exhibits a level II risk, whereas other monitoring points maintain a normal status.
引用
收藏
页数:26
相关论文
共 50 条
  • [31] Risk Assessment to Major Tunnel Construction Based on TFCE
    Qu Zhiming
    Gong Sheqiang
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 206 - 209
  • [32] A safety risk assessment method for TBM tunnel construction based on attribute interval identification theory
    Bo Wang
    Qikai Li
    Zefan Xu
    Shibin Niu
    Xiangtian Nie
    Scientific Reports, 15 (1)
  • [33] A Comprehensive Assessment Method for Safety Risk of Gas Tunnel Construction Based on Fuzzy Bayesian Network
    Qiu, Daohong
    Qu, Cong
    Xue, Yiguo
    Zhou, Binghua
    Li, Xin
    Ma, Xinmin
    Cui, Jiuhua
    POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2020, 29 (06): : 4269 - 4289
  • [34] Safety-Risk Assessment for TBM Construction of Hydraulic Tunnel Based on Fuzzy Evidence Reasoning
    Zhang, Zhixiao
    Wang, Bo
    Wang, Xiangfeng
    He, Yintao
    Wang, Hanxu
    Zhao, Shunbo
    PROCESSES, 2022, 10 (12)
  • [35] Safety management of environmental construction projects based on BIM and RFID technology
    School of Emergency Management and Safety Engineering, China University of Mining and Technology-Beijing, Haidian, Beijing
    100080, China
    Nanotechnol. Environ. Eng., 2022, 2 (447-454): : 447 - 454
  • [36] Safety risk assessment and early warning of chemical contamination in vegetable oil
    Niu, Bing
    Zhang, Hui
    Zhou, Guangya
    Zhang, Shuwen
    Yang, Yunfeng
    Deng, Xiaojun
    Chen, Qin
    FOOD CONTROL, 2021, 125
  • [37] Construction health and safety, BIM and cloud technology
    Bennett, Liz
    Mahdjoubi, Lamine
    2013 IEEE FIFTH INTERNATIONAL CONFERENCE ON CLOUD COMPUTING TECHNOLOGY AND SCIENCE (CLOUDCOM), VOL 2, 2013, : 215 - 218
  • [38] Safety management of environmental construction projects based on BIM and RFID technology
    Zhang X.
    Nanotechnology for Environmental Engineering, 2022, 7 (2) : 447 - 454
  • [39] Construction of Safety Early Warning Model for Construction of Engineering Based on Convolution Neural Network
    Zhao, Changge
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [40] Work safety early warning management based on risk management
    Gong Yunhua
    Luo Yun
    ENGINEERING STRUCTURAL INTEGRITY: RESEARCH, DEVELOPMENT AND APPLICATION, VOLS 1 AND 2, 2007, : 1243 - 1246