A Comprehensive Appraisal of the Factors Impacting Construction Project Delivery Method Selection: A Systematic Analysis

被引:7
|
作者
Zhong, QingPing [1 ]
Tang, Hui [1 ]
Chen, Chuan [2 ]
Igor, Martek [3 ]
机构
[1] Sichuan Univ, Inst Disaster Management & Reconstruct, Chengdu, Sichuan, Peoples R China
[2] Sichuan Univ, Business Sch, Wangjiang Campus, Chengdu 610065, Sichuan, Peoples R China
[3] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
基金
中国国家自然科学基金;
关键词
Project delivery method; PDM; project procurement; procurement selection; delivery selection; DESIGN-BUILD; HIGHWAY DESIGN; CRITERIA; INFRASTRUCTURE; MANAGEMENT;
D O I
10.1080/13467581.2022.2060983
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects may be procured by various means: design-build (DB), design-bid-build (DBB), construction management at risk (CM-at risk), and integrated project delivery (IPD), among many others. Each approach must be considered in selecting the most appropriate procurement strategy for any specific project. Thus, in making that choice, a selection approach along with selection criteria need to be considered. This study seeks to reassert clarity by consolidating the available literature on factors impacting project delivery selection and presenting a definitive, comprehensive list of those factors. The approach relies on systematic analysis. An initial retrieved 224 papers across 53 journals was reduced to 45 papers relevant to construction projects. These each offered between four to 39 factors. An examination and rationalization of themes distilled to a definitive 22 criteria and 35 sub-criteria. Chief among these, in descending order of reported frequency, were: owner related issues, contractor issues, time, cost, quality, contract disputes, risk, market conditions, regulation, complexity, innovation, scope, site, community support, project size, project type, resource availability, natural disasters, political impact, sustainability, culture, and safety. The factors will vary project-to-project, and a discussion of the impacts of these factors on the project delivery method selection is offered.
引用
收藏
页码:802 / 820
页数:19
相关论文
共 50 条
  • [41] Innovations in Project Delivery Method Selection Approach in the Texas Department of Transportation
    Khwaja, Nabeel
    O'Brien, William J.
    Martinez, Mayra
    Sankaran, Bharathwaj
    O'Connor, James T.
    Hale, William Bill
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (06)
  • [42] Analysis Of The Effect Of Environmental Factors On The Construction Phase Of The Project
    Li, Hongwen
    ENVIRONMENTAL PROTECTION AND RESOURCES EXPLOITATION, PTS 1-3, 2013, 807-809 : 1527 - 1529
  • [43] Analysis of factors critical to construction project success in Malaysia
    Yong, Yee
    Mustaffa, Nur
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (05) : 543 - +
  • [44] Selection of construction project schedule alternatives based on improved VIKOR method
    Wang R.-C.
    Deng J.
    Cao T.-T.
    1600, Zhejiang University (50): : 2025 - 2030
  • [45] Configuration Analysis of Integrated Project Delivery Principles' Obstacle to Construction Project Level of Collaboration
    Mei, Tingting
    Zhong, Shuda
    Lan, Huabin
    Guo, Zeng
    Qin, Yi
    SUSTAINABILITY, 2023, 15 (04)
  • [46] Six Sigma project selection: an analysis of responsible factors
    Sharma, Sunil
    Chetiya, Anuradha R.
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2010, 1 (04) : 280 - 292
  • [47] Cloudy with a Chance of Fuzzy: Building a Multicriteria Uncertainty Model for Construction Project Delivery Selection
    Martin, Hector
    Lewis, Timothy M.
    Petersen, Andrew
    Peters, Everson
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (01)
  • [48] A method for the systematic selection of technique factors in paediatric CT
    Kotre, CJ
    Willis, SP
    BRITISH JOURNAL OF RADIOLOGY, 2003, 76 (901): : 51 - 56
  • [49] Identifying Innovative Reliable Criteria Governing the Selection of Infrastructures Construction Project Delivery Systems
    Meshref, Ahmed Nouh
    Elkasaby, E. A.
    Wageh, Omnia
    OPEN ENGINEERING, 2021, 11 (01): : 269 - 280
  • [50] Factors affecting the choice of construction project delivery in developing oil and gas economies
    Martin, Hector
    Lewis, Timothy M.
    Petersen, Andrew
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2016, 12 (03) : 170 - 188