Selection of construction project schedule alternatives based on improved VIKOR method

被引:1
|
作者
Wang R.-C. [1 ]
Deng J. [1 ]
Cao T.-T. [1 ]
机构
[1] State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin
来源
| 1600年 / Zhejiang University卷 / 50期
关键词
Multi-criteria group decision making; Network schedule optimization; Subjective preference; Two-tuple linguistic; VIKOR method;
D O I
10.3785/j.issn.1008-973X.2016.10.025
中图分类号
学科分类号
摘要
A method based on improved VIKOR was proposed in order to solve the decision makers' preference on evaluation criteria. The method used language variables to qualitatively evaluate various criteria and used the two-tuple linguistic to aggregate experts' evaluation on criteria. Decision makers' subjective preference and criteria objective weight were considered to make the criteria's weight more reasonable. Because the decision maker wants a solution that is the closest to the ideal, the alternatives are evaluated according to all established criteria. The VIKOR method was used to solve the network schedule optimization plans decision making problem, through measuring the distance between the alternatives and the best values to get the compromised result. An example analysis was given to illustrate the effectiveness and practicability of the proposed method. © 2016, Zhejiang University Press. All right reserved.
引用
收藏
页码:2025 / 2030
页数:5
相关论文
共 23 条
  • [1] Wang J.-Q., Programming method of fuzzy group multiple criteria decision making with incomplete information, Journal of Systems Engineering and Electronics, 26, 11, pp. 1604-1608, (2004)
  • [2] Wu T., Dan L.S., Blackhurst J., Et al., AIDEA: a methodology for supplier evaluation and selection in a supplier-based manufacturing environment, International Journal of Manufacturing Technology and Management, 11, 2, pp. 174-192, (2007)
  • [3] Wu C., Li H.-L., The decision method of fuzzy AHP, Journal of Industrial Engineering and Engineering Management, 15, 1, pp. 63-64, (2001)
  • [4] Deng Y., Plant location selection based on fuzzy TOPSIS, International Journal of Advanced Manufacturing Technology, 28, 7-8, pp. 839-844, (2006)
  • [5] Sanayei A., Mousavi S.F., Yazdankhah A., Group decision making process for supplier selection with VIKOR under fuzzy environment, Expert Systems with Applications, 37, 1, pp. 24-30, (2010)
  • [6] Ruan L.-F., Chen J.-L., Green building supplier selection based on fuzzy VIKOR method, Statistics and Decision, 21, pp. 62-65, (2011)
  • [7] Salehi K., A hybrid fuzzy MCDM approach for project selection problem, Decision Science Letters, 4, 1, pp. 109-116, (2015)
  • [8] Tian J., Zhang P.-Z., Wang K.-L., Et al., The integrating model of expert's opinion based on Delphi method, System Engineering Theory and Practice, 24, 1, pp. 57-62, (2004)
  • [9] Chang J.-E., Jiang T.-L., Research on the weight of coefficient through analytic hierarchy process, Journal of Wuhan University of Technology: Information and Management Engineering, 29, 1, pp. 153-156, (2007)
  • [10] Wan J., Xing H.-G., Zhang X.-H., Algorithm of adjusting weights of decision-makers in multi-attribute group decision-making based on entropy theory, Control and Decision, 25, 6, pp. 907-910, (2010)