A Comprehensive Appraisal of the Factors Impacting Construction Project Delivery Method Selection: A Systematic Analysis

被引:7
|
作者
Zhong, QingPing [1 ]
Tang, Hui [1 ]
Chen, Chuan [2 ]
Igor, Martek [3 ]
机构
[1] Sichuan Univ, Inst Disaster Management & Reconstruct, Chengdu, Sichuan, Peoples R China
[2] Sichuan Univ, Business Sch, Wangjiang Campus, Chengdu 610065, Sichuan, Peoples R China
[3] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic, Australia
基金
中国国家自然科学基金;
关键词
Project delivery method; PDM; project procurement; procurement selection; delivery selection; DESIGN-BUILD; HIGHWAY DESIGN; CRITERIA; INFRASTRUCTURE; MANAGEMENT;
D O I
10.1080/13467581.2022.2060983
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects may be procured by various means: design-build (DB), design-bid-build (DBB), construction management at risk (CM-at risk), and integrated project delivery (IPD), among many others. Each approach must be considered in selecting the most appropriate procurement strategy for any specific project. Thus, in making that choice, a selection approach along with selection criteria need to be considered. This study seeks to reassert clarity by consolidating the available literature on factors impacting project delivery selection and presenting a definitive, comprehensive list of those factors. The approach relies on systematic analysis. An initial retrieved 224 papers across 53 journals was reduced to 45 papers relevant to construction projects. These each offered between four to 39 factors. An examination and rationalization of themes distilled to a definitive 22 criteria and 35 sub-criteria. Chief among these, in descending order of reported frequency, were: owner related issues, contractor issues, time, cost, quality, contract disputes, risk, market conditions, regulation, complexity, innovation, scope, site, community support, project size, project type, resource availability, natural disasters, political impact, sustainability, culture, and safety. The factors will vary project-to-project, and a discussion of the impacts of these factors on the project delivery method selection is offered.
引用
收藏
页码:802 / 820
页数:19
相关论文
共 50 条
  • [31] A Qualitative Analysis of Factors Impacting Comprehensive Cleft Lip and Palate Care in Ghana
    Sommer, Chelsea L.
    Wankier, Ali P.
    Obiri-Yeboah, Solomon
    Gyamfi, Seth
    Frimpong, Barbara Amponsah
    Dickerson, Ty
    CLEFT PALATE-CRANIOFACIAL JOURNAL, 2021, 58 (06): : 746 - 754
  • [32] THE PRODUCT-PATH-ANALYSIS - A METHOD OF SOCIOECONOMIC PROJECT APPRAISAL
    SCHWEFEL, D
    REVUE CANADIENNE D ETUDES DU DEVELOPPEMENT-CANADIAN JOURNAL OF DEVELOPMENT STUDIES, 1989, 10 (02): : 211 - 223
  • [33] Laser scanning technology for construction project delivery in developing economies: a confirmatory factor analysis of hindering factors
    Ikuabe, Matthew
    Aghimien, Douglas
    Aigbavboa, Clinton
    Oke, Ayodeji
    Thwala, Wellington Didibhuku
    JOURNAL OF SCIENCE AND TECHNOLOGY POLICY MANAGEMENT, 2025, 16 (10) : 79 - 97
  • [34] Assessment of Construction Project Contractor Selection Success Factors considering Their Interconnections
    Khalid K. Naji
    Murat Gunduz
    Mohammad H. Falamarzi
    KSCE Journal of Civil Engineering, 2022, 26 : 3677 - 3690
  • [35] Assessment of Construction Project Contractor Selection Success Factors considering Their Interconnections
    Naji, Khalid K.
    Gunduz, Murat
    Falamarzi, Mohammad H.
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (09) : 3677 - 3690
  • [36] RESEARCH AND DEVELOPMENT PROJECT SELECTION: A COMPREHENSIVE ANALYSIS OF THE TRENDS AND METHODS
    Turkmen, G. Filiz
    Topcu, Y. I.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2021, 32 (04) : 28 - 43
  • [37] A comprehensive analysis of the benefits of integrated digital delivery in construction projects
    Wuni, Ibrahim Yahaya
    Abankwa, Derek Asante
    Koc, Kerim
    Atuahene, Bernard Tuffour
    Saka, Abdullahi
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,
  • [38] Eliminating economic wastes in construction through the use of prequalification in contractors' selection in construction project delivery in Nigeria
    Alfred, OO
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 435 - 439
  • [39] Confined site construction An empirical analysis of factors impacting health and safety management
    Spillane, John P.
    Oyedele, Lukumon O.
    von Meding, Jason
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2012, 10 (03) : 397 - 420
  • [40] Choosing an Appropriate Construction Project Delivery Method Using FAHP in China
    Zhang, X. L.
    Wang, L. H.
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 78 - +