Structural model of cost overrun factors affecting Pakistani construction projects

被引:1
|
作者
Memon, Aftab Hameed [1 ]
Memon, Abdul Qadir [1 ]
Memon, Muneeb Ayub [1 ]
Sahito, Jam Shahzeb Khan [1 ]
机构
[1] Quaid Awam Univ Engn Sci & Technol, Dept Civil Engn, Nawabshah, Pakistan
关键词
Cost Performance; Cost Overruns; Construction; PLS-SEM Structural Equation; Modeling; Pakistan; INFRASTRUCTURE PROJECTS; DELAYS; INDUSTRY; TIME;
D O I
10.22581/muet1982.2302.12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The structural model was created and tested with Smart-PLS software using data from a questionnaire survey of 131 construction practitioners. Six constructs were used to categorize the factors. The model identifies 21 critical factors in Pakistani construction projects, with resource management ranking first. Contract management issues can also contribute significantly to project cost overruns. Model assessment results indicate that the developed model has a substantial power of explaining the factors of cost performance while R2 value showed that 45.7% variance is explained by the model. The model developed model will serve as a jumping-off point for academics, researchers, and practitioners in developing a cost-control system. It is suggested that establishing an efficient and effective contract management protocol among stakeholders throughout the design and supervision stages is extremely beneficial for improving project cost performance and significantly reducing time overruns.
引用
收藏
页码:108 / 123
页数:16
相关论文
共 50 条
  • [1] Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
    Larsen, Jesper Kranker
    Shen, Geoffrey Qiping
    Lindhard, Soren Munch
    Brunoe, Thomas Ditlev
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
  • [2] Model of Predicting Cost Overrun in Construction Projects
    Plebankiewicz, Edyta
    SUSTAINABILITY, 2018, 10 (12)
  • [3] Analysis of Key Factors of Cost Overrun in Construction Projects Based on Structural Equation Modeling
    Dong, Sizi
    Ahmed, Mukhtar
    Chatpattananan, Vuttichai
    SUSTAINABILITY, 2025, 17 (05)
  • [4] Identifying factors causing cost overrun of the construction projects in India
    Swapnil P Wanjari
    Gaurav Dobariya
    Sādhanā, 2016, 41 : 679 - 693
  • [5] Identifying factors causing cost overrun of the construction projects in India
    Wanjari, Swapnil P.
    Dobariya, Gaurav
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2016, 41 (06): : 679 - 693
  • [6] Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects
    Wyke, Simon
    Lindhard, Soren Munch
    Larsen, Jesper Kranker
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 31 (06) : 2415 - 2436
  • [7] Prediction of Cost Overrun Risk in Construction Projects
    Plebankiewicz, Edyta
    Wieczorek, Damian
    SUSTAINABILITY, 2020, 12 (22) : 1 - 15
  • [8] Causes of Construction Projects Cost Overrun in Brazil
    Franca, Alda
    Haddad, Assed
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2018, 9 (01): : 69 - 83
  • [9] Managing Cost Risks: Toward a Taxonomy of Cost Overrun Factors in Building Construction Projects
    Annamalaisami, Cindrela Devi
    Kuppuswamy, Ananthanarayanan
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2021, 7 (02):
  • [10] Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation
    Xie, Wenwen
    Deng, Binchao
    Yin, Yilin
    Lv, Xindong
    Deng, Zhenhua
    BUILDINGS, 2022, 12 (11)