From theoretical to sustainable potential for run-of-river hydropower development in the upper Indus basin

被引:4
|
作者
Dhaubanjar, Sanita [1 ,2 ]
Lutz, Arthur F. [2 ]
Pradhananga, Saurav [5 ]
Smolenaars, Wouter [5 ]
Khanal, Sonu [4 ]
Biemans, Hester [3 ,5 ]
Nepal, Santosh [5 ]
Ludwig, Fulco [5 ]
Shrestha, Arun Bhakta [1 ]
Immerzeel, Walter W. [2 ]
机构
[1] Int Ctr Integrated Mt Dev ICIMOD, Lalitpur 44700, Nepal
[2] Univ Utrecht, Fac Geosci, Dept Phys Geog, Princetonlaan 8a, NL-3584 CB Utrecht, Netherlands
[3] Wageningen Univ & Res, Environm Sci Grp, Droevendaalsesteeg 4, NL-6708 PB Wageningen, Netherlands
[4] FutureWater, Costerweg 1V, NL-6702 AA Wageningen, Netherlands
[5] Int Water Management Inst, Kathmandu 44600, Nepal
关键词
Sustainable hydropower development; Hydropower planning; Hydropower policy; Energy potential; Upper Indus; Integrated river basin management; HyPE; Energy justice; CLEAN DEVELOPMENT MECHANISM; CLIMATE-CHANGE; POLITICAL ECOLOGY; HIMALAYAN REGION; SITE SELECTION; SMALL-SCALE; LARGE DAMS; ENERGY; WATER; POWER;
D O I
10.1016/j.apenergy.2023.122372
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A comprehensive assessment of hydropower resource potential considering factors beyond technical and financial parameters is missing for the upper Indus basin (UIB). Our framework takes a systems approach to quantify the theoretical to sustainable hydropower potential by successively considering natural, technical, financial, anthropogenic, environmental, and geo-hazard risk constraints on hydropower at individual sites as well as at the basin -scale. Theoretical potential of the UIB is 1564 TWh/yr at 500-m resolution. Across three energy focus and three geo-hazard risk scenarios, our cost -minimization model finds that technical (12%- 19%), financial (6%-17%) and sustainable (2%-10%) potential are a small portion of the theoretical value. Mixed development combining plants of various size, cost and configuration provides the highest potential with the best spatial coverage. Alongside, our review of 20 datasets reveals a visualized potential exceeding 300 TWh/yr from 447 hydropower plants across the UIB, with only a quarter of the potential materialized by mostly large plants in the mainstreams. Hydropower cost curves show that Swat and Kabul sub -basins have a larger proportion of cost-effective and sustainable potential untapped by the visualized potential. Water use for other sectors represents the strongest constraints, reducing a third of the technical potential when evaluating sustainable potential. Ultimately, human decisions regarding scale, configuration and sustainability have a larger influence on hydropower potential than model parameter assumptions. In quantifying hydropower potential under many policy scenarios, we demonstrate the need for defining hydropower sustainability from a basin -scale perspective towards energy justice and balanced fulfilment of Sustainable Development Goals for water and energy across the Indus.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] Analysis of implications of a regulation on design discharge of run-of-river hydropower projects in Nepal
    Bhattarai, Saroj Babu
    Shrestha, Ram M.
    SUSTAINABLE WATER RESOURCES MANAGEMENT, 2023, 9 (03)
  • [42] Water Quality Analysis: Ecological Integrity Conformance of Run-of-River Hydropower Plants
    Macabiog, Rose Ellen N.
    Dela Cruz, Jennifer C.
    Amado, Timothy
    2018 IEEE 10TH INTERNATIONAL CONFERENCE ON HUMANOID, NANOTECHNOLOGY, INFORMATION TECHNOLOGY, COMMUNICATION AND CONTROL, ENVIRONMENT AND MANAGEMENT (HNICEM), 2018,
  • [43] Run-of-river Power Plant Sohlstufe Lehen - Hydropower within Urban Areas
    Pfisterer, Martin
    WASSERWIRTSCHAFT, 2012, 102 (7-8) : 65 - 70
  • [44] Modeling Hydrodynamic Changes Induced by Run-of-River Hydropower Plants along the Prahova River in Romania
    Nistoran, Daniela Elena Gogoase
    Ionescu, Cristina Sorana
    Brasoveanu, Livioara
    Armas, Iuliana
    Opris, Ioana
    Costinas, Sorina
    JOURNAL OF ENERGY ENGINEERING, 2018, 144 (02)
  • [45] Ecological Protection and Sustainable Development of Indus River Basin, PAKISTAN - Issues and Challenges
    Saeed, Fawad
    PROCEEDINGS OF THE 1ST INTERNATIONAL YELLOW RIVER FORUM ON RIVER BASIN MANAGEMENT, VOL III, 2003, : 447 - 458
  • [46] Selecting a small run-of-river hydropower plant by the analytic hierarchy process (AHP): A case study of Mino-Sil river basin, Spain
    Luis Fuentes-Bargues, Jose
    Sebastian Ferrer-Gisbert, Pablo
    ECOLOGICAL ENGINEERING, 2015, 85 : 307 - 316
  • [47] Run-of-river hydropower in the UK and Ireland: the case for abstraction licences based on future flows
    Dallison, Richard J. H.
    Patil, Sopan D.
    ENVIRONMENTAL RESEARCH: INFRASTRUCTURE AND SUSTAINABILITY, 2023, 3 (04):
  • [48] Hydropower Potential in the Neckar River Basin
    Reiss, Johannes
    Dussling, Uwe
    Heimerl, Stephan
    WASSERWIRTSCHAFT, 2012, 102 (7-8) : 59 - 64
  • [49] Impact evaluation of the run-of-river hydropower projects on the water quality dynamics of the Sindh River in the Northwestern Himalayas
    Sofi, Mohd Sharjeel
    Hamid, Aadil
    Bhat, Sami Ullah
    Rashid, Irfan
    Kuniyal, Jagdish Chandra
    ENVIRONMENTAL MONITORING AND ASSESSMENT, 2022, 194 (09)
  • [50] Automated operation of run-of-river hydropower plants - Water regime regulation and control technology
    Keil, Stefan
    WASSERWIRTSCHAFT, 2008, 98 (06) : 26 - 28