From theoretical to sustainable potential for run-of-river hydropower development in the upper Indus basin

被引:4
|
作者
Dhaubanjar, Sanita [1 ,2 ]
Lutz, Arthur F. [2 ]
Pradhananga, Saurav [5 ]
Smolenaars, Wouter [5 ]
Khanal, Sonu [4 ]
Biemans, Hester [3 ,5 ]
Nepal, Santosh [5 ]
Ludwig, Fulco [5 ]
Shrestha, Arun Bhakta [1 ]
Immerzeel, Walter W. [2 ]
机构
[1] Int Ctr Integrated Mt Dev ICIMOD, Lalitpur 44700, Nepal
[2] Univ Utrecht, Fac Geosci, Dept Phys Geog, Princetonlaan 8a, NL-3584 CB Utrecht, Netherlands
[3] Wageningen Univ & Res, Environm Sci Grp, Droevendaalsesteeg 4, NL-6708 PB Wageningen, Netherlands
[4] FutureWater, Costerweg 1V, NL-6702 AA Wageningen, Netherlands
[5] Int Water Management Inst, Kathmandu 44600, Nepal
关键词
Sustainable hydropower development; Hydropower planning; Hydropower policy; Energy potential; Upper Indus; Integrated river basin management; HyPE; Energy justice; CLEAN DEVELOPMENT MECHANISM; CLIMATE-CHANGE; POLITICAL ECOLOGY; HIMALAYAN REGION; SITE SELECTION; SMALL-SCALE; LARGE DAMS; ENERGY; WATER; POWER;
D O I
10.1016/j.apenergy.2023.122372
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A comprehensive assessment of hydropower resource potential considering factors beyond technical and financial parameters is missing for the upper Indus basin (UIB). Our framework takes a systems approach to quantify the theoretical to sustainable hydropower potential by successively considering natural, technical, financial, anthropogenic, environmental, and geo-hazard risk constraints on hydropower at individual sites as well as at the basin -scale. Theoretical potential of the UIB is 1564 TWh/yr at 500-m resolution. Across three energy focus and three geo-hazard risk scenarios, our cost -minimization model finds that technical (12%- 19%), financial (6%-17%) and sustainable (2%-10%) potential are a small portion of the theoretical value. Mixed development combining plants of various size, cost and configuration provides the highest potential with the best spatial coverage. Alongside, our review of 20 datasets reveals a visualized potential exceeding 300 TWh/yr from 447 hydropower plants across the UIB, with only a quarter of the potential materialized by mostly large plants in the mainstreams. Hydropower cost curves show that Swat and Kabul sub -basins have a larger proportion of cost-effective and sustainable potential untapped by the visualized potential. Water use for other sectors represents the strongest constraints, reducing a third of the technical potential when evaluating sustainable potential. Ultimately, human decisions regarding scale, configuration and sustainability have a larger influence on hydropower potential than model parameter assumptions. In quantifying hydropower potential under many policy scenarios, we demonstrate the need for defining hydropower sustainability from a basin -scale perspective towards energy justice and balanced fulfilment of Sustainable Development Goals for water and energy across the Indus.
引用
收藏
页数:22
相关论文
共 50 条
  • [31] Transboundary cooperation a potential route to sustainable development in the Indus basin
    Vinca, Adriano
    Parkinson, Simon
    Riahi, Keywan
    Byers, Edward
    Siddiqi, Afreen
    Muhammad, Abubakr
    Ilyas, Ansir
    Yogeswaran, Nithiyanandam
    Willaarts, Barbara
    Magnuszewski, Piotr
    Awais, Muhammad
    Rowe, Andrew
    Djilali, Ned
    NATURE SUSTAINABILITY, 2021, 4 (04) : 331 - +
  • [32] Verification of a robust method for sizing and siting the small hydropower run-of-river plant potential by using GIS
    Tamm, Ottar
    Tamm, Toomas
    RENEWABLE ENERGY, 2020, 155 : 153 - 159
  • [33] Optimization of Run-of-River Hydropower Plant Design under Climate Change Conditions
    Parisa Sarzaeim
    Omid Bozorg-Haddad
    Babak Zolghadr-Asli
    Elahe Fallah-Mehdipour
    Hugo A. Loáiciga
    Water Resources Management, 2018, 32 : 3919 - 3934
  • [34] Analysis of implications of a regulation on design discharge of run-of-river hydropower projects in Nepal
    Saroj Babu Bhattarai
    Ram M. Shrestha
    Sustainable Water Resources Management, 2023, 9
  • [35] Optimization of Run-of-River Hydropower Plant Design under Climate Change Conditions
    Sarzaeim, Parisa
    Bozorg-Haddad, Omid
    Zolghadr-Asli, Babak
    Fallah-Mehdipour, Elahe
    Loaiciga, Liugo A.
    WATER RESOURCES MANAGEMENT, 2018, 32 (12) : 3919 - 3934
  • [36] Institutions and processes for scaling up renewables: Run-of-river hydropower in British Columbia
    Jaccard, Mark
    Melton, Noel
    Nyboer, John
    ENERGY POLICY, 2011, 39 (07) : 4042 - 4050
  • [37] Analysis for cost estimation of low head run-of-river small hydropower schemes
    Singal, S. K.
    Saini, R. P.
    Raghuvanshi, C. S.
    ENERGY FOR SUSTAINABLE DEVELOPMENT, 2010, 14 (02) : 117 - 126
  • [38] Current and Future Environmental Balance of Small-Scale Run-of-River Hydropower
    Gallagher, John
    Styles, David
    McNabola, Aonghus
    Williams, A. Prysor
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2015, 49 (10) : 6344 - 6351
  • [39] LCOE-Based Optimization for the Design of Small Run-of-River Hydropower Plants
    Amougou, Claude Boris
    Tsuanyo, David
    Fioriti, Davide
    Kenfack, Joseph
    Aziz, Abdoul
    Abiama, Patrice Ele
    ENERGIES, 2022, 15 (20)
  • [40] The future of Alpine Run-of-River hydropower production: Climate change, environmental flow requirements, and technical production potential
    Tobias, Wechsler
    Manfreda, Stahli
    Klaus, Jorde
    Massimiliano, Zappa
    Bettina, Schaefli
    SCIENCE OF THE TOTAL ENVIRONMENT, 2023, 890