From theoretical to sustainable potential for run-of-river hydropower development in the upper Indus basin

被引:4
|
作者
Dhaubanjar, Sanita [1 ,2 ]
Lutz, Arthur F. [2 ]
Pradhananga, Saurav [5 ]
Smolenaars, Wouter [5 ]
Khanal, Sonu [4 ]
Biemans, Hester [3 ,5 ]
Nepal, Santosh [5 ]
Ludwig, Fulco [5 ]
Shrestha, Arun Bhakta [1 ]
Immerzeel, Walter W. [2 ]
机构
[1] Int Ctr Integrated Mt Dev ICIMOD, Lalitpur 44700, Nepal
[2] Univ Utrecht, Fac Geosci, Dept Phys Geog, Princetonlaan 8a, NL-3584 CB Utrecht, Netherlands
[3] Wageningen Univ & Res, Environm Sci Grp, Droevendaalsesteeg 4, NL-6708 PB Wageningen, Netherlands
[4] FutureWater, Costerweg 1V, NL-6702 AA Wageningen, Netherlands
[5] Int Water Management Inst, Kathmandu 44600, Nepal
关键词
Sustainable hydropower development; Hydropower planning; Hydropower policy; Energy potential; Upper Indus; Integrated river basin management; HyPE; Energy justice; CLEAN DEVELOPMENT MECHANISM; CLIMATE-CHANGE; POLITICAL ECOLOGY; HIMALAYAN REGION; SITE SELECTION; SMALL-SCALE; LARGE DAMS; ENERGY; WATER; POWER;
D O I
10.1016/j.apenergy.2023.122372
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A comprehensive assessment of hydropower resource potential considering factors beyond technical and financial parameters is missing for the upper Indus basin (UIB). Our framework takes a systems approach to quantify the theoretical to sustainable hydropower potential by successively considering natural, technical, financial, anthropogenic, environmental, and geo-hazard risk constraints on hydropower at individual sites as well as at the basin -scale. Theoretical potential of the UIB is 1564 TWh/yr at 500-m resolution. Across three energy focus and three geo-hazard risk scenarios, our cost -minimization model finds that technical (12%- 19%), financial (6%-17%) and sustainable (2%-10%) potential are a small portion of the theoretical value. Mixed development combining plants of various size, cost and configuration provides the highest potential with the best spatial coverage. Alongside, our review of 20 datasets reveals a visualized potential exceeding 300 TWh/yr from 447 hydropower plants across the UIB, with only a quarter of the potential materialized by mostly large plants in the mainstreams. Hydropower cost curves show that Swat and Kabul sub -basins have a larger proportion of cost-effective and sustainable potential untapped by the visualized potential. Water use for other sectors represents the strongest constraints, reducing a third of the technical potential when evaluating sustainable potential. Ultimately, human decisions regarding scale, configuration and sustainability have a larger influence on hydropower potential than model parameter assumptions. In quantifying hydropower potential under many policy scenarios, we demonstrate the need for defining hydropower sustainability from a basin -scale perspective towards energy justice and balanced fulfilment of Sustainable Development Goals for water and energy across the Indus.
引用
收藏
页数:22
相关论文
共 50 条
  • [21] Research on flow in water intake of a run-of-river hydropower plant
    Balzannikov, Mikhail
    RSP 2017 - XXVI R-S-P SEMINAR 2017 THEORETICAL FOUNDATION OF CIVIL ENGINEERING, 2017, 117
  • [22] Technical performance evaluation and optimization of a run-of-river hydropower facility
    Nedaei, Mojtaba
    Walsh, Philip R.
    RENEWABLE ENERGY, 2022, 182 : 343 - 362
  • [23] How Run-of-River Operation Affects Hydropower Generation and Value
    Henriette I. Jager
    Mark S. Bevelhimer
    Environmental Management, 2007, 40 : 1004 - 1015
  • [24] Identification of Potential Locations for Run-of-River Hydropower Plants Using a GIS-Based Procedure
    Sammartano, Vincenzo
    Liuzzo, Lorena
    Freni, Gabriele
    ENERGIES, 2019, 12 (18)
  • [25] Providing a GIS-based framework for Run-Of-River hydropower site selection: a model based on sustainable development energy approach
    Jafari, Mostafa
    Fazloula, Ramin
    Effati, Meysam
    Jamali, Ali
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2021, 38 (02) : 102 - 126
  • [26] Development of a fish-friendly turbine-operation mode in run-of-river hydropower plants on the River Mosel
    Becker, Bernhard
    Notermanns, Felix
    Reuter, Christian
    Schuettrumpf, Holger
    HYDROLOGIE UND WASSERBEWIRTSCHAFTUNG, 2009, 53 (01): : 4 - 12
  • [27] Management strategies for run-of-river hydropower plants: an optimal switching approach
    Olofsson, Marcus
    Onskog, Thomas
    Lundstrom, Niklas L. P.
    OPTIMIZATION AND ENGINEERING, 2022, 23 (03) : 1707 - 1731
  • [28] Management strategies for run-of-river hydropower plants: an optimal switching approach
    Marcus Olofsson
    Thomas Önskog
    Niklas L. P. Lundström
    Optimization and Engineering, 2022, 23 : 1707 - 1731
  • [29] Improving frequency containment reserve provision in run-of-river hydropower plants
    Gerini, F.
    Vagnoni, E.
    Cherkaoui, R.
    Paolone, M.
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2021, 28
  • [30] Transboundary cooperation a potential route to sustainable development in the Indus basin
    Adriano Vinca
    Simon Parkinson
    Keywan Riahi
    Edward Byers
    Afreen Siddiqi
    Abubakr Muhammad
    Ansir Ilyas
    Nithiyanandam Yogeswaran
    Barbara Willaarts
    Piotr Magnuszewski
    Muhammad Awais
    Andrew Rowe
    Ned Djilali
    Nature Sustainability, 2021, 4 : 331 - 339