Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost

被引:7
|
作者
Jiang, Meixian [1 ]
Feng, Jiajia [1 ]
Zhou, Jian [1 ]
Zhou, Lin [1 ]
Ma, Fangzheng [1 ]
Wu, Guanghua [1 ]
Zhang, Yuqiu [2 ]
机构
[1] Zhejiang Univ Technol, Coll Mech Engn, Hangzhou 310000, Peoples R China
[2] South China Univ Technol, Coll Biomed Sci & Engn, Guangzhou 510000, Peoples R China
基金
中国国家自然科学基金;
关键词
berth allocation problem; quay crane assignment problem; uncertainty; multi-terminal coordination; carbon cost; adaptive genetic algorithm; ALLOCATION; ARRIVAL;
D O I
10.3390/su15065018
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As container ports become increasingly important to the global supply chain, a growing number of ports are improving their competencies by consolidating multiple terminal resources internally. In addition, in the context of energy conservation and emission reduction, ports measure competitiveness not only in terms of terminal size, throughput and service level, but also in terms of low energy consumption and low pollution. Therefore, a nonlinear mixed-integer programming model considering the cost of carbon is developed for the multi-terminal berth and quay crane joint robust scheduling problem under uncertain environments to minimize the sum of expectation and variance of total cost under all randomly generated samples. The model considers the water depth and interference of quay cranes, etc. The expected vessel arrival time and the average operational efficiency plus relaxation are used as their actual values when scheduling. Finally, an improved adaptive genetic algorithm is developed by combining the simulated annealing mechanism, and numerical experiments are designed. The results show that the joint berth and quay crane scheduling with uncertainties and a multi-terminal coordination mechanism can effectively reduce the operating cost, including carbon costs and the vessel departure delay rate, and can improve resource utilization. Meanwhile, the scheduling with the multi-terminal coordination mechanism can obtain more significant improvement effects than the scheduling with uncertainties.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Combined Configuration of Container Terminal Berth and Quay Crane considering Carbon Cost
    Duan, Jianguo
    Liu, Yi
    Zhang, Qinglei
    Qin, Jiyun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021 (2021)
  • [2] Integrated Berth and Crane Scheduling Problem Considering Crane Coverage in Multi-Terminal Tidal Ports under Uncertainty
    Jiang, Meixian
    Zhou, Jian
    Feng, Jiajia
    Zhou, Lin
    Ma, Fangzheng
    Wu, Guanghua
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (04)
  • [3] Multi-objective optimization of joint scheduling of berth and quay crane under green ports
    Yang, Xu
    SEVENTH INTERNATIONAL CONFERENCE ON TRAFFIC ENGINEERING AND TRANSPORTATION SYSTEM, ICTETS 2023, 2024, 13064
  • [4] Integration of Berth Allocation and Quay Crane Assignment in Tidal Container Ports
    陆志强
    吴文
    韩笑乐
    NIRAVONG Juliane
    Journal of Donghua University(English Edition), 2015, 32 (04) : 559 - 564
  • [5] Optimisation of berth and quay crane joint scheduling considering efficiency and energy consumption
    Wen, Dusu
    Li, Xumao
    Ren, Xiaoyun
    Ji, Mingjun
    Long, Qiuxi
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2023, 17 (04) : 487 - 505
  • [6] Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal
    Qian Jifeng
    Zhu Xiaoning
    Liu Yongjun
    APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 1437 - 1444
  • [7] Simultaneous Berth and Quay Crane Allocation Problem in Container Terminal
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2113 - 2118
  • [8] Multi-objective optimization of container terminal scheduling considering shared operation of adjacent quay crane under quay crane failure
    Wu N.
    Wu D.
    Wang N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 331 - 339
  • [9] Optimization of Integrated Tugboat-Berth-Quay Crane Scheduling in Container Ports Considering Uncertainty in Vessel Arrival Times and Berthing Preferences
    Chu, Liangyong
    Zhang, Jiawen
    Chen, Xiuqian
    Yu, Qing
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2024, 12 (09)
  • [10] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107