共 50 条
- [3] Multi-objective optimization of joint scheduling of berth and quay crane under green ports SEVENTH INTERNATIONAL CONFERENCE ON TRAFFIC ENGINEERING AND TRANSPORTATION SYSTEM, ICTETS 2023, 2024, 13064
- [6] Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 1437 - 1444
- [8] Multi-objective optimization of container terminal scheduling considering shared operation of adjacent quay crane under quay crane failure Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 331 - 339
- [10] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107