Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost

被引:7
|
作者
Jiang, Meixian [1 ]
Feng, Jiajia [1 ]
Zhou, Jian [1 ]
Zhou, Lin [1 ]
Ma, Fangzheng [1 ]
Wu, Guanghua [1 ]
Zhang, Yuqiu [2 ]
机构
[1] Zhejiang Univ Technol, Coll Mech Engn, Hangzhou 310000, Peoples R China
[2] South China Univ Technol, Coll Biomed Sci & Engn, Guangzhou 510000, Peoples R China
基金
中国国家自然科学基金;
关键词
berth allocation problem; quay crane assignment problem; uncertainty; multi-terminal coordination; carbon cost; adaptive genetic algorithm; ALLOCATION; ARRIVAL;
D O I
10.3390/su15065018
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As container ports become increasingly important to the global supply chain, a growing number of ports are improving their competencies by consolidating multiple terminal resources internally. In addition, in the context of energy conservation and emission reduction, ports measure competitiveness not only in terms of terminal size, throughput and service level, but also in terms of low energy consumption and low pollution. Therefore, a nonlinear mixed-integer programming model considering the cost of carbon is developed for the multi-terminal berth and quay crane joint robust scheduling problem under uncertain environments to minimize the sum of expectation and variance of total cost under all randomly generated samples. The model considers the water depth and interference of quay cranes, etc. The expected vessel arrival time and the average operational efficiency plus relaxation are used as their actual values when scheduling. Finally, an improved adaptive genetic algorithm is developed by combining the simulated annealing mechanism, and numerical experiments are designed. The results show that the joint berth and quay crane scheduling with uncertainties and a multi-terminal coordination mechanism can effectively reduce the operating cost, including carbon costs and the vessel departure delay rate, and can improve resource utilization. Meanwhile, the scheduling with the multi-terminal coordination mechanism can obtain more significant improvement effects than the scheduling with uncertainties.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] An Efficient Algorithm for the Berth and Quay Crane Assignments Considering Operator Performance in Container Terminal Using Particle Swarm Model
    Tengecha, Nyamatari Anselem
    Zhang, Xinyu
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (09)
  • [32] Research on coupling scheduling of quay crane dispatch and configuration in the container terminal
    Liang, Chengji
    Fan, Lubin
    Xu, Dehong
    Ding, Yi
    Gen, Mitsuo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 649 - 657
  • [33] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [34] Optimization Research of Berth Allocation and Quay Crane Assignment at Container Terminal Based on The Genetic Algorithm
    Gao, Zhi Jun
    Cao, Jin Xin
    Zhao, Qing Yu
    ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 931 - 934
  • [35] A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) : 675 - 689
  • [36] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Abtin Nourmohammadzadeh
    Stefan Voß
    Annals of Mathematics and Artificial Intelligence, 2022, 90 : 831 - 853
  • [37] The Joint quay crane scheduling and block allocation problem in container terminals
    Hu, Hongtao
    Chen, Xiazhong
    Zhen, Lu
    Ma, Chengle
    Zhang, Xiaotian
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2019, 30 (01) : 51 - 75
  • [38] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Nourmohammadzadeh, Abtin
    Voss, Stefan
    ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE, 2022, 90 (7-9) : 831 - 853
  • [39] Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
    Hsu, Hsien-Pin
    Wang, Chia-Nan
    Fu, Hsin-Pin
    Dang, Thanh-Tuan
    MATHEMATICS, 2021, 9 (18)
  • [40] Recoverable Robustness Considering Carbon Tax in Weekly Berth and Quay Crane Planning
    Sun, Qian
    Zhen, Lu
    Xiao, Liyang
    Tan, Zheyi
    SMART TRANSPORTATION SYSTEMS 2019, 2019, 149 : 75 - 84