Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost

被引:7
|
作者
Jiang, Meixian [1 ]
Feng, Jiajia [1 ]
Zhou, Jian [1 ]
Zhou, Lin [1 ]
Ma, Fangzheng [1 ]
Wu, Guanghua [1 ]
Zhang, Yuqiu [2 ]
机构
[1] Zhejiang Univ Technol, Coll Mech Engn, Hangzhou 310000, Peoples R China
[2] South China Univ Technol, Coll Biomed Sci & Engn, Guangzhou 510000, Peoples R China
基金
中国国家自然科学基金;
关键词
berth allocation problem; quay crane assignment problem; uncertainty; multi-terminal coordination; carbon cost; adaptive genetic algorithm; ALLOCATION; ARRIVAL;
D O I
10.3390/su15065018
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As container ports become increasingly important to the global supply chain, a growing number of ports are improving their competencies by consolidating multiple terminal resources internally. In addition, in the context of energy conservation and emission reduction, ports measure competitiveness not only in terms of terminal size, throughput and service level, but also in terms of low energy consumption and low pollution. Therefore, a nonlinear mixed-integer programming model considering the cost of carbon is developed for the multi-terminal berth and quay crane joint robust scheduling problem under uncertain environments to minimize the sum of expectation and variance of total cost under all randomly generated samples. The model considers the water depth and interference of quay cranes, etc. The expected vessel arrival time and the average operational efficiency plus relaxation are used as their actual values when scheduling. Finally, an improved adaptive genetic algorithm is developed by combining the simulated annealing mechanism, and numerical experiments are designed. The results show that the joint berth and quay crane scheduling with uncertainties and a multi-terminal coordination mechanism can effectively reduce the operating cost, including carbon costs and the vessel departure delay rate, and can improve resource utilization. Meanwhile, the scheduling with the multi-terminal coordination mechanism can obtain more significant improvement effects than the scheduling with uncertainties.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] Integrating optimization method for continuous berth and quay crane scheduling in container terminals
    Lu, Z.-Q. (zhiqianglu@tongji.edu.cn), 1600, Shanghai Jiaotong University (47):
  • [22] A NOVEL STRATEGY FOR BERTH AND QUAY CRANE ALLOCATION UNDER DISRUPTION IN CONTAINER TERMINAL
    Yang, Jie
    Gao, Hong
    Liu, Wei
    Liu, Tao
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2016, 12 (05): : 1535 - 1551
  • [23] Integrated discrete berth allocation and quay crane scheduling in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    ENGINEERING OPTIMIZATION, 2010, 42 (08) : 747 - 761
  • [24] Assessment of quay and yard transshipment operations under proximity limitations in multi-terminal container ports
    Heilig, Leonard
    Lalla-Ruiz, Eduardo
    Bode, Christoph
    Yoss, Stefan
    PROCEEDINGS OF THE 52ND ANNUAL HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES, 2019, : 1548 - 1557
  • [25] Joint Configuration and Scheduling Optimization of Dual-trolley Quay Crane and AGV for Container Terminal with Considering Energy Saving
    Fan H.-M.
    Guo Z.-F.
    Yue L.-J.
    Ma M.-Z.
    Zidonghua Xuebao/Acta Automatica Sinica, 2021, 47 (10): : 2412 - 2426
  • [26] Berth Allocation in Transshipment Ports by Considering Quay Crane Coverage and Ship Fuel Consumption
    Yu, Shucheng
    Wang, Bochen
    Zhang, Si
    Zhen, Lu
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2022, 39 (03)
  • [27] Multi-stage rescheduling decision of container terminal quay crane considering the fault
    Zheng H.
    Wang Z.
    Zhu X.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2021, 41 (12): : 3321 - 3335
  • [28] An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal
    Yang, Chunxia
    Wang, Xiaojun
    Li, Zhenfeng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) : 243 - 253
  • [29] CONTAINER TERMINAL BERTH-QUAY CRANE CAPACITY PLANNING BASED ON MARKOV CHAIN
    Jiang, Meixian
    Wu, Guoxing
    Zheng, Jianpeng
    Wu, Guanghua
    PROMET-TRAFFIC & TRANSPORTATION, 2021, 33 (02): : 267 - 281
  • [30] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals
    Ren, Jie
    Shang, Xiao Ting
    Cao, Jin Xin
    PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040