Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost

被引:7
|
作者
Jiang, Meixian [1 ]
Feng, Jiajia [1 ]
Zhou, Jian [1 ]
Zhou, Lin [1 ]
Ma, Fangzheng [1 ]
Wu, Guanghua [1 ]
Zhang, Yuqiu [2 ]
机构
[1] Zhejiang Univ Technol, Coll Mech Engn, Hangzhou 310000, Peoples R China
[2] South China Univ Technol, Coll Biomed Sci & Engn, Guangzhou 510000, Peoples R China
基金
中国国家自然科学基金;
关键词
berth allocation problem; quay crane assignment problem; uncertainty; multi-terminal coordination; carbon cost; adaptive genetic algorithm; ALLOCATION; ARRIVAL;
D O I
10.3390/su15065018
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As container ports become increasingly important to the global supply chain, a growing number of ports are improving their competencies by consolidating multiple terminal resources internally. In addition, in the context of energy conservation and emission reduction, ports measure competitiveness not only in terms of terminal size, throughput and service level, but also in terms of low energy consumption and low pollution. Therefore, a nonlinear mixed-integer programming model considering the cost of carbon is developed for the multi-terminal berth and quay crane joint robust scheduling problem under uncertain environments to minimize the sum of expectation and variance of total cost under all randomly generated samples. The model considers the water depth and interference of quay cranes, etc. The expected vessel arrival time and the average operational efficiency plus relaxation are used as their actual values when scheduling. Finally, an improved adaptive genetic algorithm is developed by combining the simulated annealing mechanism, and numerical experiments are designed. The results show that the joint berth and quay crane scheduling with uncertainties and a multi-terminal coordination mechanism can effectively reduce the operating cost, including carbon costs and the vessel departure delay rate, and can improve resource utilization. Meanwhile, the scheduling with the multi-terminal coordination mechanism can obtain more significant improvement effects than the scheduling with uncertainties.
引用
收藏
页数:20
相关论文
共 50 条
  • [41] A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    Moccia, L
    Cordeau, JF
    Gaudioso, M
    Laporte, G
    NAVAL RESEARCH LOGISTICS, 2006, 53 (01) : 45 - 59
  • [42] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Yan Wang
    Kap Hwan Kim
    Journal of Intelligent Manufacturing, 2011, 22 : 459 - 470
  • [43] Ant Colony System for Solving Quay Crane Scheduling Problem in Container Terminal
    Azza, Lajjam
    El Merouani, Mohamed
    Medouri, Adbdellatif
    PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 176 - 180
  • [44] A quay crane scheduling algorithm considering the workload of yard cranes in a container yard
    Wang, Yan
    Kim, Kap Hwan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 459 - 470
  • [45] A quay crane scheduling method considering interference of yard cranes in container terminals
    Jung, Da Hun
    Park, Young-Man
    Lee, Byung Kwon
    Kim, Kap Hwan
    Ryu, Kwang Ryel
    MICAI 2006: ADVANCES IN ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4293 : 461 - +
  • [46] Resource Capacity Requirement for Multi-Terminal Cooperation in Container Ports
    Lee, Byung Kwon
    Low, Joyce M. W.
    APPLIED SCIENCES-BASEL, 2021, 11 (19):
  • [47] Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
    Chargui, Kaoutar
    Zouadi, Tarik
    El Fallahi, Abdellah
    Reghioui, Mohamed
    Aouam, Tarik
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154
  • [48] Optimization Research of Joint Quay Crane Scheduling and Block Selection in Container Terminals
    Chen Xiazhong
    Zhang Ye
    Hu Hongtao
    2017 14TH INTERNATIONAL CONFERENCE ON SERVICES SYSTEMS AND SERVICES MANAGEMENT (ICSSSM), 2017,
  • [49] An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports
    Tavakkoli-Moghaddam, R.
    Makui, A.
    Salahi, S.
    Bazzazi, M.
    Taheri, F.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (01) : 241 - 248
  • [50] Modeling berth allocation and quay crane assignment considering QC driver cost and operating efficiency
    He, Junliang
    Wang, Yu
    Tan, Caimao
    Yu, Hang
    ADVANCED ENGINEERING INFORMATICS, 2021, 47