Optimisation of berth and quay crane joint scheduling considering efficiency and energy consumption

被引:0
|
作者
Wen, Dusu [1 ,2 ]
Li, Xumao [3 ,4 ,5 ]
Ren, Xiaoyun [6 ]
Ji, Mingjun [1 ,7 ]
Long, Qiuxi [8 ]
机构
[1] Dalian Maritime Univ, Coll Transportat Engn, Dalian 116026, Peoples R China
[2] CCCC Water Transportat Consultants Co Ltd, Beijing, Peoples R China
[3] Minist Transport, Transport Planning & Res Inst, Beijing 100028, Peoples R China
[4] Lab Traff & Transport Planning Digitalizat, Beijing 100028, Peoples R China
[5] Southeast Univ, Sch Transportat, Nanjing 210096, Peoples R China
[6] Xiangtan Univ, Xiangtan 411105, Hunan, Peoples R China
[7] Dalian Maritime Univ, Coll Transportat Engn, Dalian 116026, Peoples R China
[8] Australian Natl Univ, Coll Engn & Comp Sci, Canberra, ACT 2601, Australia
关键词
container terminal; joint scheduling; multi-objective optimisation; particle swarm algorithm; PSO; energy consumption; ALLOCATION; ASSIGNMENT;
D O I
10.1504/IJSTL.2023.136048
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In order to reduce the energy consumption of ships and quay crane in the port area, the joint scheduling problem of berth and quay crane is studied on the premise that ship arrival information and terminal status information are known. Considering the needs of the shipping company and the interests of the port owner, a multi-objective mixed integer programming model is established to maximise the operational efficiency of ships in the port and minimise the total cost of the terminal, and a local search strategy is designed to solve the quay crane scheduling problem between adjacent ships. At the same time, combining topological structure and iterative coefficient mechanism, an improved particle swarm optimisation algorithm is designed to solve the model, and the Pareto non-inferior solution set is obtained. Finally, the applicability and effectiveness of the proposed model and algorithm are verified by comparison of algorithms with different scales and analysis of multi-scenario results.
引用
收藏
页码:487 / 505
页数:20
相关论文
共 50 条
  • [41] A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning
    Liang, Chengji
    Huang, Youfang
    Yang, Yang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (03) : 1021 - 1028
  • [42] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [43] Joint berth allocation and quay crane assignment under different carbon taxation policies
    Wang, Tingsong
    Wang, Xinchang
    Meng, Qiang
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 117 : 18 - 36
  • [44] Modeling and solution of the joint quay crane and truck scheduling problem
    Tang, Lixin
    Zhao, Jiao
    Liu, Jiyin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 236 (03) : 978 - 990
  • [45] Robust Optimisation for an Integrated Model of Berth and Quay Crane Assignment at Maritime Container Terminals Respecting Uncertain Numbers of Quay Cranes
    Nourmohammadzadeh, Abtin
    Voss, Stefan
    COMPUTATIONAL LOGISTICS, ICCL 2024, 2024, 15168 : 208 - 222
  • [46] The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study
    Abou Kasm, Omar
    Diabat, Ali
    Cheng, T. C. E.
    ANNALS OF OPERATIONS RESEARCH, 2020, 291 (1-2) : 435 - 461
  • [47] The impacts of time segment modeling in berth allocation and quay crane assignment on terminal efficiency
    Ma, Hoi-Lam
    Wang, Zhengxu
    Chung, S. H.
    Chan, Felix T. S.
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2019, 119 (05) : 968 - 992
  • [48] A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
    Han, Xiao-le
    Lu, Zhi-qiang
    Xi, Li-feng
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (03) : 1327 - 1340
  • [49] A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) : 675 - 689
  • [50] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Abtin Nourmohammadzadeh
    Stefan Voß
    Annals of Mathematics and Artificial Intelligence, 2022, 90 : 831 - 853