共 50 条
- [32] Recoverable Robustness Considering Carbon Tax in Weekly Berth and Quay Crane Planning SMART TRANSPORTATION SYSTEMS 2019, 2019, 149 : 75 - 84
- [33] Joint Configuration and Scheduling Optimization of Dual-trolley Quay Crane and AGV for Container Terminal with Considering Energy Saving Zidonghua Xuebao/Acta Automatica Sinica, 2021, 47 (10): : 2412 - 2426
- [34] A Proactive Approach for Simultaneous Berth and Quay Crane Scheduling Problem with Stochastic Handling Time CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 74 - 79
- [35] A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem 2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
- [36] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040
- [39] Compact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problems OPSEARCH, 2022, 59 : 413 - 439
- [40] Combination of a Dynamic-Hybrid Berth Allocation Problem with a Quay Crane Scheduling Problem 2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,