Optimisation of berth and quay crane joint scheduling considering efficiency and energy consumption

被引:0
|
作者
Wen, Dusu [1 ,2 ]
Li, Xumao [3 ,4 ,5 ]
Ren, Xiaoyun [6 ]
Ji, Mingjun [1 ,7 ]
Long, Qiuxi [8 ]
机构
[1] Dalian Maritime Univ, Coll Transportat Engn, Dalian 116026, Peoples R China
[2] CCCC Water Transportat Consultants Co Ltd, Beijing, Peoples R China
[3] Minist Transport, Transport Planning & Res Inst, Beijing 100028, Peoples R China
[4] Lab Traff & Transport Planning Digitalizat, Beijing 100028, Peoples R China
[5] Southeast Univ, Sch Transportat, Nanjing 210096, Peoples R China
[6] Xiangtan Univ, Xiangtan 411105, Hunan, Peoples R China
[7] Dalian Maritime Univ, Coll Transportat Engn, Dalian 116026, Peoples R China
[8] Australian Natl Univ, Coll Engn & Comp Sci, Canberra, ACT 2601, Australia
关键词
container terminal; joint scheduling; multi-objective optimisation; particle swarm algorithm; PSO; energy consumption; ALLOCATION; ASSIGNMENT;
D O I
10.1504/IJSTL.2023.136048
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In order to reduce the energy consumption of ships and quay crane in the port area, the joint scheduling problem of berth and quay crane is studied on the premise that ship arrival information and terminal status information are known. Considering the needs of the shipping company and the interests of the port owner, a multi-objective mixed integer programming model is established to maximise the operational efficiency of ships in the port and minimise the total cost of the terminal, and a local search strategy is designed to solve the quay crane scheduling problem between adjacent ships. At the same time, combining topological structure and iterative coefficient mechanism, an improved particle swarm optimisation algorithm is designed to solve the model, and the Pareto non-inferior solution set is obtained. Finally, the applicability and effectiveness of the proposed model and algorithm are verified by comparison of algorithms with different scales and analysis of multi-scenario results.
引用
收藏
页码:487 / 505
页数:20
相关论文
共 50 条
  • [21] Model for disruption management of berth allocation & quay crane scheduling in container terminals
    Zeng, Qing-Cheng
    Hu, Xiang-Pei
    Yang, Zhong-Zhen
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2026 - 2035
  • [22] CONTINUOUS DYNAMIC BERTH ALLOCATION STRATEGY BASING ON QUAY-CRANE SCHEDULING
    Chen, Jinlong
    Xu, Ziqi
    FIFTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER THEORY AND ENGINEERING (ICACTE 2012), 2012, : 211 - 221
  • [23] MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
    Agra, Agostinho
    Oliveira, Maryse
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 138 - 148
  • [24] Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey
    Rodrigues, Filipe
    Agra, Agostinho
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (02) : 501 - 524
  • [25] Berth allocation and quay crane assignment considering the adoption of different green technologies
    Yu, Jingjing
    Tang, Guolei
    Voss, Stefan
    Song, Xiangqun
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2023, 176
  • [26] Integrating optimization method for continuous berth and quay crane scheduling in container terminals
    Lu, Z.-Q. (zhiqianglu@tongji.edu.cn), 1600, Shanghai Jiaotong University (47):
  • [27] Combined Configuration of Container Terminal Berth and Quay Crane considering Carbon Cost
    Duan, Jianguo
    Liu, Yi
    Zhang, Qinglei
    Qin, Jiyun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021 (2021)
  • [28] Quay crane scheduling in automated container terminal for the trade-off between operation efficiency and energy consumption
    Tan, Caimao
    Yan, Wei
    Yue, Jiantao
    ADVANCED ENGINEERING INFORMATICS, 2021, 48
  • [29] Multiobjective hybrid genetic algorithm for quay crane scheduling in berth allocation planning
    Liang, Chengji
    Lin, Lin
    Jo, Jungbok
    International Journal of Manufacturing Technology and Management, 2009, 16 (1-2) : 127 - 146
  • [30] Quay crane scheduling in automated container terminal for the trade-off between operation efficiency and energy consumption
    Tan, Caimao
    Yan, Wei
    Yue, Jiantao
    Advanced Engineering Informatics, 2021, 48