Construction stability analysis of intersection tunnel in city under CRD method

被引:1
|
作者
Ren, Yiwei [1 ]
Zhou, Shijun [2 ]
Jia, Jiayin [2 ]
Yuan, Qiang [1 ]
Zhou, Zelin [3 ]
Liu, Maoyi [4 ]
He, Huayong [5 ]
机构
[1] Chongqing Univ, State Key Lab Coal Mine Disaster Dynam & Control, Chongqing, Peoples R China
[2] Chongqing Zhonghuan Construct Co Ltd, Chongqing, Peoples R China
[3] China 19th Met Corp, Chengdu, Sichuan, Peoples R China
[4] Chongqing City Construct Investment Grp Co Ltd, Chongqing, Peoples R China
[5] Shanghai Jianke Engn Consulting Co Ltd, Shanghai, Peoples R China
关键词
city intersection tunnel; CRD method; engineering disasters; numerical simulation; in-situ monitoring; STRENGTH;
D O I
10.3389/feart.2023.1264140
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The construction of city intersection tunnels cause multiple redistribution of surrounding rock stress, resulting in the engineering disasters such as instability in existing tunnels and collapses of ground buildings. To mitigate formation disturbances effectively, the Center Cross Diagram (CRD) method is employed in city tunnel construction. In this study, a numerical model for a city intersection tunnel is developed based on an underground circular roads project in Chongqing, China, to analyze the safety of the tunnel structure and the stability of ground buildings under the CRD method. The numerical simulation results obtain that the excavation of pilot-tunnel (4) will reduce the surrounding rock stress and control the rock strata subsidence, and reveal that the excavation of pilot-tunnel (4) is the key step of CRD method. The maximum compressive stress and tensile stress of surrounding rock first increase and then decrease during the excavation of pilot-tunnels (1), (2), (3), and (4). Simultaneously, the deformation of the ground building experiences a slow initial increase followed by a rapid rise before stabilizing. Furthermore, the excavation of the main tunnel leads to an increase of 0.73, 0.35, and 0.52 times in the vault subsidence value, left haunch convergence value, and right haunch convergence value of branch tunnel #1, respectively. Finally, the convergence process of branch tunnel #1 is discussed through the in-situ monitoring, which is divided into three stages: rapid deformation, deceleration deformation, and stable deformation. The final horizontal convergence value and subsidence value of cross-section K0+360 are respectively 84% and 78% of those at cross-section K0+395.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Tunnel face stability analysis using Kinematical Element Method
    Qarmout, Mahmoud
    Koenig, Diethard
    Gussmann, Peter
    Thewes, Markus
    Schanz, Tom
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 85 : 354 - 367
  • [42] Stability analysis of a tunnel using LIDAR data and the keyblock method
    Agustín Menéndez-Díaz
    Ramón Argüelles-Fraga
    Silverio García-Cortés
    Celestino Ordóñez-Galán
    Bulletin of Engineering Geology and the Environment, 2016, 75 : 469 - 483
  • [43] Stability analysis of a tunnel using LIDAR data and the keyblock method
    Menendez-Diaz, Agustin
    Arguelles-Fraga, Ramon
    Garcia-Cortes, Silverio
    Ordonez-Galan, Celestino
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2016, 75 (02) : 469 - 483
  • [44] CONSTRUCTION OF A SHIELD TUNNEL UNDER THE SEA
    YAMASHITA, O
    ONO, K
    WASANO, S
    KOBAYASHI, I
    TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 959 - 964
  • [45] Analysis and application of sliding body diagrams to face stability in tunnel construction safety
    Tian, SJ
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 668 - 672
  • [46] Diagrams analysis and application of construction face stability in tunnel and shaft excavation safety
    Tian Sijin
    MINE HAZARDS PREVENTION AND CONTROL TECHNOLOGY, 2007, : 363 - 367
  • [47] Tunnel stability analysis during construction using a neuro-fuzzy system
    Rangel, JL
    Iturrarán-Viveros, U
    Ayala, AG
    Cervantes, F
    INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 2005, 29 (15) : 1433 - 1456
  • [48] Analysis of lateral slope stability during construction of a loess tunnel with a large section
    Chen, Siyang
    Zhu, Yanpeng
    Li, Zhong
    Huang, Lihua
    Zhang, Haoliang
    Modern Tunnelling Technology, 2014, 51 (01) : 82 - 89
  • [49] Monitoring and Analysis of Ming Dynasty City Wall Safety Influenced by Construction of Jiuhuashan Tunnel
    Wang Yuan
    Li ErBing
    Ge Zhenzhen
    Huang Shen
    2013 FIFTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2013), 2013, : 702 - 706
  • [50] High Tunnel Construction and Production in a Large Metropolitan City
    Lamont, W. J., Jr.
    INTERNATIONAL SYMPOSIUM ON HIGH TUNNEL HORTICULTURAL CROP PRODUCTION, 2013, 987 : 45 - 47