Construction stability analysis of intersection tunnel in city under CRD method

被引:1
|
作者
Ren, Yiwei [1 ]
Zhou, Shijun [2 ]
Jia, Jiayin [2 ]
Yuan, Qiang [1 ]
Zhou, Zelin [3 ]
Liu, Maoyi [4 ]
He, Huayong [5 ]
机构
[1] Chongqing Univ, State Key Lab Coal Mine Disaster Dynam & Control, Chongqing, Peoples R China
[2] Chongqing Zhonghuan Construct Co Ltd, Chongqing, Peoples R China
[3] China 19th Met Corp, Chengdu, Sichuan, Peoples R China
[4] Chongqing City Construct Investment Grp Co Ltd, Chongqing, Peoples R China
[5] Shanghai Jianke Engn Consulting Co Ltd, Shanghai, Peoples R China
关键词
city intersection tunnel; CRD method; engineering disasters; numerical simulation; in-situ monitoring; STRENGTH;
D O I
10.3389/feart.2023.1264140
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The construction of city intersection tunnels cause multiple redistribution of surrounding rock stress, resulting in the engineering disasters such as instability in existing tunnels and collapses of ground buildings. To mitigate formation disturbances effectively, the Center Cross Diagram (CRD) method is employed in city tunnel construction. In this study, a numerical model for a city intersection tunnel is developed based on an underground circular roads project in Chongqing, China, to analyze the safety of the tunnel structure and the stability of ground buildings under the CRD method. The numerical simulation results obtain that the excavation of pilot-tunnel (4) will reduce the surrounding rock stress and control the rock strata subsidence, and reveal that the excavation of pilot-tunnel (4) is the key step of CRD method. The maximum compressive stress and tensile stress of surrounding rock first increase and then decrease during the excavation of pilot-tunnels (1), (2), (3), and (4). Simultaneously, the deformation of the ground building experiences a slow initial increase followed by a rapid rise before stabilizing. Furthermore, the excavation of the main tunnel leads to an increase of 0.73, 0.35, and 0.52 times in the vault subsidence value, left haunch convergence value, and right haunch convergence value of branch tunnel #1, respectively. Finally, the convergence process of branch tunnel #1 is discussed through the in-situ monitoring, which is divided into three stages: rapid deformation, deceleration deformation, and stable deformation. The final horizontal convergence value and subsidence value of cross-section K0+360 are respectively 84% and 78% of those at cross-section K0+395.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Analysis of large cross section loess tunnel construction method
    Yang, Jian-Min
    Journal of Railway Engineering Society, 2015, 32 (10) : 86 - 92
  • [32] Method for evaluating traffic management at intersection and its applying under China City condition
    Li, J
    Tang, YS
    Ding, TQ
    Chen, X
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1077 - 1081
  • [33] Nonlinear analysis of NATM tunnel construction with the boundary element method
    Prazeres, Plinio G. C.
    Thoeni, Klaus
    Beer, Gernot
    COMPUTERS AND GEOTECHNICS, 2012, 40 : 160 - 173
  • [34] Stability analysis of tunnel supporting structure under complex condition
    Jia, Jian-Qing
    Wang, Hong-Tu
    Li, Jing
    Zhang, Xian
    Hu, Guo-Zhong
    Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (11): : 3599 - 3603
  • [35] Stability analysis of tunnel supporting structure under complex condition
    Jia Jian-qing
    Wang Hong-tu
    Li Jing
    Zhang Xian
    Hu Guo-zhong
    ROCK AND SOIL MECHANICS, 2010, 31 (11) : 3599 - +
  • [36] Analysis of Structure Stability of Underwater Shield Tunnel under Different Temperatures Based on Finite Element Method
    Zhu, Lei
    Wu, Qianwen
    Jiang, Yuke
    Li, Zhenyu
    Wang, Yuke
    WATER, 2023, 15 (14)
  • [37] Field Investigation on the Stability of the Tunnel Surrounding Rock and the Support Measures under TBM construction
    Wang, YuSuo
    Wang, MingNian
    Wu, ZhengQun
    Yang, QiXin
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 2182 - 2185
  • [38] Force State of Country Rock and Supporting Structure in Multi-arch Tunnel under Central Hole plus CRD Method
    Jun, Li
    Lin, Wang Zong
    Fei, Zhong Jun
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1192 - 1196
  • [39] Analysis of the tunnel construction and monitoring measurement under complicated geological conditions
    Gu, Zhanfei
    Liu, Zhikui
    Chen, Hongchi
    Wang, Yawei
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 2091 - +
  • [40] Risk Analysis on Tunnel Construction in Gravel under Xiangjiang River Dam
    Zhao, Dan
    Peng, Liming
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 220 - 224