Construction stability analysis of intersection tunnel in city under CRD method

被引:1
|
作者
Ren, Yiwei [1 ]
Zhou, Shijun [2 ]
Jia, Jiayin [2 ]
Yuan, Qiang [1 ]
Zhou, Zelin [3 ]
Liu, Maoyi [4 ]
He, Huayong [5 ]
机构
[1] Chongqing Univ, State Key Lab Coal Mine Disaster Dynam & Control, Chongqing, Peoples R China
[2] Chongqing Zhonghuan Construct Co Ltd, Chongqing, Peoples R China
[3] China 19th Met Corp, Chengdu, Sichuan, Peoples R China
[4] Chongqing City Construct Investment Grp Co Ltd, Chongqing, Peoples R China
[5] Shanghai Jianke Engn Consulting Co Ltd, Shanghai, Peoples R China
关键词
city intersection tunnel; CRD method; engineering disasters; numerical simulation; in-situ monitoring; STRENGTH;
D O I
10.3389/feart.2023.1264140
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The construction of city intersection tunnels cause multiple redistribution of surrounding rock stress, resulting in the engineering disasters such as instability in existing tunnels and collapses of ground buildings. To mitigate formation disturbances effectively, the Center Cross Diagram (CRD) method is employed in city tunnel construction. In this study, a numerical model for a city intersection tunnel is developed based on an underground circular roads project in Chongqing, China, to analyze the safety of the tunnel structure and the stability of ground buildings under the CRD method. The numerical simulation results obtain that the excavation of pilot-tunnel (4) will reduce the surrounding rock stress and control the rock strata subsidence, and reveal that the excavation of pilot-tunnel (4) is the key step of CRD method. The maximum compressive stress and tensile stress of surrounding rock first increase and then decrease during the excavation of pilot-tunnels (1), (2), (3), and (4). Simultaneously, the deformation of the ground building experiences a slow initial increase followed by a rapid rise before stabilizing. Furthermore, the excavation of the main tunnel leads to an increase of 0.73, 0.35, and 0.52 times in the vault subsidence value, left haunch convergence value, and right haunch convergence value of branch tunnel #1, respectively. Finally, the convergence process of branch tunnel #1 is discussed through the in-situ monitoring, which is divided into three stages: rapid deformation, deceleration deformation, and stable deformation. The final horizontal convergence value and subsidence value of cross-section K0+360 are respectively 84% and 78% of those at cross-section K0+395.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Shallow depth of the tunnel excavation response research based on CRD method
    Jiang Annan
    Li Peng
    Shi Hongtao
    CEIS 2011, 2011, 15
  • [22] Numerical simulation analysis of the stability of the construction face of a super long tunnel under conditions of precipitation and abundant water
    Dun, Huoda
    Chen, Song
    Liu, Haitao
    Chen, Chen
    Zhang, Yuansheng
    Yuan, Ying
    FRONTIERS IN MATERIALS, 2024, 11
  • [23] Numerical analysis of tunnel construction under an ancient massive structure
    Rampello, S
    Callisto, L
    PRE-FAILURE DEFORMATION CHARACTERISTICS OF GEOMATERIALS, VOL 1, 1999, : 549 - 554
  • [24] Construction Mechanics of In-situ Expansion of the Intersection of Existing Tunnel Shaft and Main Tunnel
    Zhao W.
    Wang X.
    Bai Q.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2021, 42 (05): : 713 - 719
  • [25] Analysis of Fire Smoke Control System of Under Construction Tunnel
    Sun Jiayun
    Fang Zheng
    Yuan Jianping
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1245 - 1250
  • [26] Stability analysis of the built tunnel support affected by construction of overlapped tunnel based on numerical simulation
    Jia, Jianqing
    Wang, Hongtong
    MODELLING AND COMPUTATION IN ENGINEERING, 2010, : 85 - 88
  • [27] Analysis of Stress-Strain Behaviours and Stability of the Ground around the Tunnel in Ho Chi Minh City during the Construction Stages
    Nguyen Anh Tuan
    2020 3RD INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTER TECHNOLOGIES (ICICT 2020), 2020, : 356 - 360
  • [28] Research on surrounding rock stability of soft rock tunnel and its construction method
    Deng, Hua-Feng
    Li, Jian-Lin
    Wang, Le-Hua
    Zhu, Min
    Deng, Cheng-Jin
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2012, 29 (05): : 668 - 673
  • [29] Analysis of effects on city metro tunnel due to adjacent pile foundation construction
    Hangzhou Xiaoshan Urban Construction Investment Group Co., Ltd, Hangzhou
    Zhejiang
    311202, China
    不详
    Zhejiang
    310012, China
    Rock Soil Mech, (577-582): : 577 - 582
  • [30] Analysis of stability of shallow-buried tunnel built by pipe-roof pre-construction method
    Li, Yong-Suo
    Zhang, Ke-Neng
    Huang, Chang-Bo
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (09): : 3646 - 3651