A hybrid metaheuristic algorithm for resource-constrained proactive project scheduling with uncertainty-handling effort

被引:4
|
作者
Cui, Xiao [1 ]
He, Zhengwen [1 ]
Wang, Nengmin [1 ]
Zheng, Weibo [1 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; Optimization model; Variable neighborhood search; Tabu search; Uncertainty-handling effort; TRADE-OFF; TABU SEARCH; ROBUST OPTIMIZATION; HEURISTIC PROCEDURES; MULTIMODE; CLASSIFICATION; MANAGEMENT; STABILITY; MAKESPAN; MINIMIZE;
D O I
10.1016/j.cie.2023.109741
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses a resource-constrained proactive project scheduling problem, where activity durations are stochastic variables and uncertainty-handling effort is devoted to decreasing the standard deviation of activity duration. The task is to determine the optimal level of uncertainty-handling effort and the corresponding baseline schedule under the constraints of renewable resources and project deadline, minimizing the total cost which consists of the uncertainty-handling cost and the robustness and adjustment costs of the baseline schedule. Based on the problem formulation, an optimization model is constructed, in which there exist two kinds of trade-off relationships among related costs. Then, for the NP-hardness of the problem, a hybrid metaheuristic algorithm is designed by combining a variable neighborhood search with a tabu search. In light of the characteristics of the problem, four measures are proposed to improve the searching efficiency of the algorithm. Finally, an extensive computational experiment is conducted on a randomly generated dataset. Based on the obtained results, the algorithm and improvement measures are evaluated, and a sensitivity analysis of the effect of key parameters on the objective function value is also carried out. The research conclusions are as follows: the algorithm equipped with all the improvement measures is the most promising algorithm for the studied problem, and the key parameters may generate an effect on the costs relevant to uncertainty.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Hybrid Heuristics for Dynamic Resource-Constrained Project Scheduling Problem
    Villela da Silva, Andre Renato
    Ochi, Luiz Satoru
    HYBRID METAHEURISTICS, 2010, 6373 : 73 - 87
  • [42] A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
    Pellerin, Robert
    Perrier, Nathalie
    Berthaut, Francois
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 280 (02) : 395 - 416
  • [43] Hybrid multimode resource-constrained maintenance project scheduling problem
    Kosztyan, Zsolt T.
    Pribojszki-Nemeth, Aniko
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [44] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem
    Peng, L.
    Wuliang, P.
    Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13
  • [45] Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    ANNALS OF OPERATIONS RESEARCH, 2019, 274 (1-2) : 187 - 210
  • [46] A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem
    Goncharov E.N.
    Journal of Applied and Industrial Mathematics, 2022, 16 (04) : 672 - 683
  • [47] Best Insertion Algorithm for Resource-constrained Project Scheduling Problem
    Pesek, Igor
    Zerovnik, Janez
    KOI 2006: 11TH INTERNATIONAL CONFERENCE ON OPERATIONAL RESEARCH, PROCEEDINGS, 2008, : 169 - 176
  • [48] Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    Annals of Operations Research, 2019, 274 : 187 - 210
  • [49] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [50] Improved ACO Algorithm for Resource-Constrained Project Scheduling Problem
    Zhou, Yumiao
    Guo, Qingshun
    Gan, Rongwei
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL III, PROCEEDINGS, 2009, : 358 - 365