A hybrid metaheuristic algorithm for resource-constrained proactive project scheduling with uncertainty-handling effort

被引:4
|
作者
Cui, Xiao [1 ]
He, Zhengwen [1 ]
Wang, Nengmin [1 ]
Zheng, Weibo [1 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, 28 Xianning West Rd, Xian 710049, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; Optimization model; Variable neighborhood search; Tabu search; Uncertainty-handling effort; TRADE-OFF; TABU SEARCH; ROBUST OPTIMIZATION; HEURISTIC PROCEDURES; MULTIMODE; CLASSIFICATION; MANAGEMENT; STABILITY; MAKESPAN; MINIMIZE;
D O I
10.1016/j.cie.2023.109741
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses a resource-constrained proactive project scheduling problem, where activity durations are stochastic variables and uncertainty-handling effort is devoted to decreasing the standard deviation of activity duration. The task is to determine the optimal level of uncertainty-handling effort and the corresponding baseline schedule under the constraints of renewable resources and project deadline, minimizing the total cost which consists of the uncertainty-handling cost and the robustness and adjustment costs of the baseline schedule. Based on the problem formulation, an optimization model is constructed, in which there exist two kinds of trade-off relationships among related costs. Then, for the NP-hardness of the problem, a hybrid metaheuristic algorithm is designed by combining a variable neighborhood search with a tabu search. In light of the characteristics of the problem, four measures are proposed to improve the searching efficiency of the algorithm. Finally, an extensive computational experiment is conducted on a randomly generated dataset. Based on the obtained results, the algorithm and improvement measures are evaluated, and a sensitivity analysis of the effect of key parameters on the objective function value is also carried out. The research conclusions are as follows: the algorithm equipped with all the improvement measures is the most promising algorithm for the studied problem, and the key parameters may generate an effect on the costs relevant to uncertainty.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [32] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [33] Population learning algorithm for resource-constrained project scheduling
    Jedrzejowicz, P
    Ratajczak, E
    ARTIFICIAL NEURAL NETS AND GENETIC ALGORITHMS, PROCEEDINGS, 2003, : 223 - 228
  • [34] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [35] Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty
    Gan, Lu
    Xu, Jiuping
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (03)
  • [36] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [37] Handling airport ground processes based on resource-constrained project scheduling
    Kuster, Jurgen
    Jannach, Dietmar
    ADVANCES IN APPLIED ARTICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4031 : 166 - 176
  • [38] Hybrid genetic algorithm for multi-mode resource-constrained project scheduling problems
    School of Economics and Management, Southeast University, Nanjing 210096, China
    Dongnan Daxue Xuebao, 2008, 4 (736-740):
  • [39] A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
    Xiong, Jian
    Chen, Ying-wu
    Yang, Ke-wei
    Zhao, Qing-song
    Xing, Li-ning
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2012, 2012
  • [40] A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    COMPUTERS & OPERATIONS RESEARCH, 2024, 166